New representation to reduce the search space for the resource-constrained project scheduling problem

被引:6
|
作者
Moumene, Khaled [1 ]
Ferland, Jacques A. [1 ]
机构
[1] Univ Montreal, Dept Informat & Rech Operat, Montreal, PQ H3C 3J7, Canada
关键词
project scheduling; resource-constrained project scheduling; activity list representation; activity set list representation; heuristics and metaheuristics;
D O I
10.1051/ro:2008010
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper describes a new representation for the solutions of the resource-constrained project scheduling problem (RCPSP) denoted Activity Set List. The most efficient heuristics for the problem use the activity list representation and the serial SGS method to construct the corresponding solution (schedule). The activity list may induce a search space of representations much larger then the space of schedules because the same schedule can correspond to many different activity list representations. We indicate how the activity set list representation can significantly reduce the search space, and how to move more efficiently through it. Furthermore, this new representation never excludes the optimal solution and it has many interesting properties. An evaluation of the search space reduction induced by this representation is made for the most used library of instances in the literature. The activity set list representation may be used to construct a new category of more efficient solution procedures for the problem.
引用
收藏
页码:215 / 228
页数:14
相关论文
共 50 条
  • [31] New meta-heuristics for the resource-constrained project scheduling problem
    Lim, Andrew
    Ma, Hong
    Rodrigues, Brian
    Tan, Sun Teck
    Xiao, Fei
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 48 - 73
  • [32] New meta-heuristics for the resource-constrained project scheduling problem
    Andrew Lim
    Hong Ma
    Brian Rodrigues
    Sun Teck Tan
    Fei Xiao
    Flexible Services and Manufacturing Journal, 2013, 25 : 48 - 73
  • [33] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [34] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [35] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    Journal of Scheduling, 2019, 22 : 211 - 237
  • [36] Periodically aggregated resource-constrained project scheduling problem
    Morin, Pierre-Antoine
    Artigues, Christian
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 792 - 817
  • [37] Integration of routing into a resource-constrained project scheduling problem
    Lacomme, Philippe
    Moukrim, Aziz
    Quilliot, Alain
    Vinot, Marina
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 421 - 464
  • [38] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [39] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [40] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287