共 50 条
- [1] Environmental risk assessment of dams at constructional phase using VIKOR and EFMEA methods (Case study: Balarood Dam, Iran) [J]. HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2020, 26 (04): : 1087 - 1107
- [2] Environmental risk assessment of a dam during construction phase [J]. GLOBAL JOURNAL OF ENVIRONMENTAL SCIENCE AND MANAGEMENT-GJESM, 2016, 2 (04): : 345 - 356
- [4] The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam) [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2016, 2 (04): : 158 - 167
- [6] Monitoring the deformations of embankment dams during construction a case study: Panzdah Khordad dam [J]. Proceedings of the Twelfth Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, Vol 1 and 2, 2003, : 771 - 773
- [7] Role of construction of large dams on river morphology (case study: the Karkheh dam in Iran) [J]. Arabian Journal of Geosciences, 2016, 9
- [8] Environmental Risk Assessment of Dams by Using Multi-Criteria Decision-Making Methods: A Case Study of the Polrood Dam, Guilan Province, Iran [J]. HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2014, 20 (01): : 69 - 85
- [9] DEVELOPING A QUANTITATIVE MODEL FOR ENVIRONMENTAL RESOURCE MANAGEMENT IN THE FUNCTIONAL SCOPE OF LARGE DAMS. A CASE STUDY OF KARKHEH DAM [J]. ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2021, 20 (01): : 25 - 35