Setup and Hardware-in-the-Loop Operation of an Open Control Research Wind Turbine on a System Test Bench

被引:0
|
作者
Leisten, Christian [1 ]
Hummel, Norman [2 ]
Jassmann, Uwe [1 ]
Abel, Dirk [1 ]
机构
[1] Rhein Westfal TH Aachen, Ctr Wind Power Drives, Inst Automat Control, Aachen, Germany
[2] Siemens AG, Siemens Digital Ind, Munich, Germany
关键词
Research Wind Turbine; Wind Turbine Control; System Test Bench; Hardware-in-the-Loop System; Inertia Emulation; Drive Train Control; Certification;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents the setup of an open control Research Wind Turbine and its validation in Hardware-in-the-Loop operation on a System Test Bench. The Wind Turbine is a modified NEG Micon NM80/2750 with a rated power of 2.75MW and all components updated to the state of the art. Its original automation is replaced by an open control based on a Programmable Logic Control by Siemens. Both the control and the operation management are implemented in MATLAB Simulink and integrated by automatic code generation which allows the efficient validation of innovative control methods in experiment after model based design in simulation. Also, the simulation models of the original Wind Turbine and the Turbine on the Test Bench are introduced. The Wind Turbine is validated on a System Test Bench in Hardware-in-the-Loop operation offering a realistic test earlier in the development process. A System Test Bench enables the efficient and reproducible investigation of the behavior of an entire Wind Turbine drive train only without the big components rotor and tower. Though, due to the missing rotor inertia, the drive train behavior differs strongly from the original one on the field. The presented Hardware-in-the-Loop system consists of the models of the wind as well as the rotor and the Inertia Emulation, which reproduces the real dynamic. It is also implemented in Simulink and realized on a dSPACE computer. The Research Wind Turbine is validated with turbulent wind in the whole operating range matching the expected behavior in simulation well. This is also the first Hardware-in-the-Loop operation of a Wind Turbine on a System Test Bench at this power level.
引用
收藏
页码:6457 / 6462
页数:6
相关论文
共 50 条
  • [1] Model Predictive Torque Control of a Wind Turbine System Test Bench in Hardware-in-the-Loop Operation
    Leisten, Christian
    Kaven, Lennard
    Jassmann, Uwe
    Abel, Dirk
    2019 18TH EUROPEAN CONTROL CONFERENCE (ECC), 2019, : 633 - 638
  • [2] A HARDWARE-IN-THE-LOOP STRATEGY FOR CONTROL OF A WIND TURBINE TEST BENCH
    Schkoda, Ryan
    Bibo, Amin
    PROCEEDINGS OF THE ASME 8TH ANNUAL DYNAMIC SYSTEMS AND CONTROL CONFERENCE, 2015, VOL 2, 2016,
  • [3] Active roll control: system design and hardware-in-the-loop test bench
    Sorniotti, A.
    Morgando, A.
    Velardocchia, M.
    VEHICLE SYSTEM DYNAMICS, 2006, 44 (489-505) : 489 - 505
  • [4] Evaluation of a Hardware-in-the-loop Test Setup Using Mechanical Measurements with a DFIG Wind Turbine Nacelle
    Neshati, Mohsen
    Zhang, Hongkun
    Thomas, Philipp
    Heller, Marcel
    Zuga, Adam
    Wenske, Jan
    SCIENCE OF MAKING TORQUE FROM WIND, TORQUE 2022, 2022, 2265
  • [5] Comparison of Hardware-in-the-Loop Control Methods for Wind Turbine Drive Trains on System Test Benches
    Kaven, Lennard
    Leisten, Christian
    Basler, Maximilian
    Jassmann, Uwe
    Abel, Dirk
    2021 EUROPEAN CONTROL CONFERENCE (ECC), 2021, : 1193 - 1198
  • [6] Hardware-In-The-Loop Test Bench For Vehicle ACC System
    Liu, Jia
    Zhang, Liyan
    Chen, Qihong
    Quan, Shuhai
    Long, Rong
    2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 1006 - 1011
  • [7] Hardware-In-The-Loop Test Bench for Fuel Cell Power System
    Huang, Ziyi
    Zhang, Liyan
    Quan, Shuhai
    2015 CHINESE AUTOMATION CONGRESS (CAC), 2015, : 1215 - 1220
  • [8] Hardware-in-the-Loop Test Bench for Artificial Lungs
    Walter, Marian
    Eisenbrand, Stephan
    Kopp, Ruedger
    Leonhardt, Steffen
    XIV RUSSIAN-GERMANY CONFERENCE ON BIOMEDICAL ENGINEERING (RGC-2019), 2019, 2140
  • [9] Pitch Axis Control for a Guided Projectile in a Wind Tunnel Hardware-in-the-Loop Setup
    Strub, Guillaume
    Theodoulis, Spilios
    Gassmann, Vincent
    Dobre, Simona
    Basset, Michel
    JOURNAL OF SPACECRAFT AND ROCKETS, 2015, 52 (06) : 1614 - 1626
  • [10] A hardware-in-the-loop test bench for wheel slip systems
    Schineis, W
    Grund, C
    TECHNOLOGY OF MEASUREMENT AND TESTING IN AUTOMOTIVE ENGINEERING, 1997, 1335 : 265 - 283