Optimum Combination of Bridge and Deck Systems for Superspan Cable-Stayed Bridges

被引:27
|
作者
Shao, Yi [1 ]
Shao, Xudong [2 ]
Li, Lifeng [2 ]
Wu, Jiajia [2 ]
机构
[1] Stanford Univ, Dept Civil & Environm Engn, Stanford, CA 94305 USA
[2] Hunan Univ, Dept Bridge Engn, Changsha 410082, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
Cable-stayed bridge; Deck system; Ultrahigh-performance concrete; Static performance; Dynamic performance; Economy; Lifecycle;
D O I
10.1061/(ASCE)BE.1943-5592.0001161
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The huge axial force in the main girder challenges the design of superspan cable-stayed bridges. To reduce the self-weight of the girder, the conventional orthotropic steel deck (OSD) system is widely adopted due to its high strength-to-weight ratio, which may generate fatigue problems. In this paper, the optimum combination of different bridge and deck systems was studied by designing a cable-stayed bridge with main span of 1,480 m. Two different bridge systems were investigated: the conventional cable-stayed bridge system and a partial ground-anchored cable-stayed bridge system with crossing stay cables (the new bridge system). Additionally, in each bridge system, three different deck systems were studied: the OSD system, a composite deck system composed of the OSD system and an ultrahigh-performance concrete (UHPC) layer, and an UHPC waffle deck panel system. Finite-element (FE) models of the six plans were developed and analyzed. The static, dynamic, and economic performances of the six plans were compared. Model tests of the composite and UHPC waffle panel systems were performed to ensure the feasibility of the design. Compared to the conventional bridge system, the new bridge system has a much smaller axial force in the main girder, greater longitudinal stiffness, and economic advantages. Under the traffic load, a much lower stress amplitude is developed in the girder with the UHPC waffle deck panel system than in girders with the other two deck systems. Compared to the OSD system, the composite and UHPC waffle panel systems are advantageous in terms of lifecycle cost. Therefore, the combination of the new bridge system and the UHPC waffle deck panel system is recommended as the optimal design plan. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:11
相关论文
共 50 条
  • [31] A Method for Closing Deck of Cable-Stayed Bridges with a Single Erection Joint
    Ling, Lihua
    Chen, Changsong
    Yan, Donghuang
    [J]. EARTH AND SPACE 2021: MATERIALS, STRUCTURES, DYNAMICS, AND CONTROL IN EXTREME ENVIRONMENTS, 2021, : 383 - 403
  • [32] Reliability-based optimum design of cable-stayed bridges
    J.H.O. Negrão
    L.M.C. Simões
    [J]. Structural and Multidisciplinary Optimization, 2004, 28 : 214 - 220
  • [33] Reliability-based optimum design of cable-stayed bridges
    Negrao, JHO
    Simoes, LMC
    [J]. STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2004, 28 (2-3) : 214 - 220
  • [34] OPTIMUM ANCHORING FOR LONG SPAN CABLE-STAYED BRIDGES.
    Ohtsuka, Hisanori
    Ohta, Toshiaki
    Imai, Fujio
    [J]. Doboku Gakkai Rombun-Hokokushu/Proceedings of the Japan Society of Civil Engineers, 1984, (350): : 87 - 95
  • [35] Parameters governing the response of under-deck cable-stayed bridges
    Ruiz-Teran, A. M.
    Aparicio, A. C.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2007, 34 (08) : 1016 - 1024
  • [36] Optimum design analysis of hybrid cable-stayed suspension bridges
    Lonetti, P.
    Pascuzzo, A.
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2014, 73 : 53 - 66
  • [37] Cable vibrations in cable-stayed bridges
    Virlogeux, M
    [J]. BRIDGE AERODYNAMICS, 1998, : 213 - 233
  • [38] Determination of optimum post-tensioning cable forces of cable-stayed bridges
    Hassan, M. M.
    Nassef, A. O.
    El Damatty, A. A.
    [J]. ENGINEERING STRUCTURES, 2012, 44 : 248 - 259
  • [39] A numerical study on nonlinear vibration of an inclined cable coupled with the deck in cable-stayed bridges
    Kang, Zhan
    Xu, Kesheng
    Luo, Zhen
    [J]. JOURNAL OF VIBRATION AND CONTROL, 2012, 18 (03) : 404 - 416
  • [40] Cable-Stayed Bridges.
    Ciolina, F.
    [J]. Travaux, 1975, (478): : 60 - 63