Reliability and efficiency of pollution removal during long-term operation of a one-stage constructed wetland system with horizontal flow

被引:47
|
作者
Jozwiakowski, Krzysztof [1 ]
Bugajski, Piotr [2 ]
Mucha, Zbigniew [3 ]
Wojcik, Wlodzimierz [4 ]
Jucherski, Andrzej [5 ]
Nastawny, Maria [5 ]
Siwiec, Tadeusz [6 ]
Mazur, Andrzej [1 ]
Obroslak, Radomir [1 ]
Gajewska, Magdalena [7 ]
机构
[1] Univ Life Sci Lublin, Dept Environm Engn & Geodesy, Leszczynskiego 7, PL-20069 Lublin, Poland
[2] Agr Univ Krakow, Dept Sanit Engn & Water Management, Al Mickiewicza 24-28, PL-30059 Krakow, Poland
[3] Cracow Univ Technol, Inst Water Supply & Environm Protect, Warszawska 24, PL-31155 Krakow, Poland
[4] Krosno State Coll, Dept Environm Engn, Rynek 1, PL-38400 Krosno, Poland
[5] Inst Technol & Life Sci Falenty, Mt Ctr Studies & Implementat Tylicz, Pulaskiego 25A, PL-33383 Tylicz, Poland
[6] Warsaw Univ Live Sci, Dept Civil Engn, Nowoursynowska 166, PL-02787 Warsaw, Poland
[7] Gdansk Univ Technol, Dept Water & Wastewater Technol, Narutowicza 11-12, PL-80233 Gdansk, Poland
关键词
Reliability; Pollution removal; Wastewater treatment; Constructed wetland; Horizontal flow; SUBSURFACE FLOW; SEWAGE-TREATMENT; WATER; NITROGEN; QUALITY;
D O I
10.1016/j.seppur.2017.06.043
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The paper presents the results of a study of the reliability and efficiency of pollutant removal during long term operation of a one-stage constructed wetland system with horizontal flow. The flow rate of the wastewater treatment plant was 1.2 m(3) d(-1), during the research period. Physical and chemical analyses of raw wastewater and treated effluent were carried out in the years 1997-2010 (14 years). During this study period, 56 series of analyses were performed and 112 wastewater samples were collected. The average efficiencies of BOD5 (Biochemical Oxygen Demand), COD (Chemical Oxygen Demand) and TSS (Total Suspended Solids) removal in the investigated facility during the 14 years of its operation were respectively: 84.7%, 80.9%, and 62.4%. The average values of these parameters in the treated wastewater were significantly lower than the values deemed acceptable by relevant regulations in Poland. The reliabilities of the wastewater treatment plant, based on the Weibull reliability theory for acceptable values of pollution parameters in the effluent of the treatment plant, were as follows: BOD5 - 92%, COD - 98%, TSS - 90%. The conducted analysis showed that the operational reliability of the one-stage horizontal subsurface flow constructed wetland (HSFCW) over the operation period was insufficient according to the Polish standards. Improvement of the reliability of the analyzed system by introduction of additional purification elements, such as irrigated biological beds or a constructed wetland with vertical wastewater flow, was recommended. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:60 / 66
页数:7
相关论文
共 50 条
  • [41] Reliability and Efficiency of Pollutant Removal in Four-Stage Constructed Wetland of SSVF-SSHF-SSHF-SSVF Type
    Gizinska-Gorna, Magdalena
    Jozwiakowski, Krzysztof
    Marzec, Michal
    WATER, 2020, 12 (11) : 1 - 25
  • [42] Long-term removals of organic micro-pollutants in reactive media of horizontal subsurface flow constructed wetland treating landfill leachate
    Witthayaphirom, Chayanid
    Chiemchaisri, Chart
    Chiemchaisri, Wilai
    Ogata, Yuka
    Ebie, Yoshitaka
    Ishigaki, Tomonori
    BIORESOURCE TECHNOLOGY, 2020, 312
  • [43] THE EFFICIENCY OF POLLUTION REMOVAL FROM DOMESTIC WASTEWATER IN CONSTRUCTED WETLAND SYSTEMS WITH VERTICAL FLOW WITH COMMON REED AND GLYCERIA MAXIMA
    Debska, Anna
    Jozwiakowski, Krzysztof
    Gizinska-Gorna, Magdalena
    Pytka, Aneta
    Marzec, Michal
    Sosnowska, Bozena
    Pienko, Agata
    JOURNAL OF ECOLOGICAL ENGINEERING, 2015, 16 (05): : 110 - 118
  • [44] Long-term effects of phosphorus deficiency on one-stage partial nitrification-anammox system and recovery strategies
    Zhang, Liang
    Tian, Zhe
    Qian, Yunzhi
    Chen, Fuqiang
    Li, Yu -You
    Wang, Xueke
    Fu, Cuilian
    Chi, Yongzhi
    JOURNAL OF CLEANER PRODUCTION, 2023, 402
  • [45] Cold Temperature Effects on Long-Term Nitrogen Transformation Pathway in a Tidal Flow Constructed Wetland
    Pang, Yunmeng
    Zhang, Yan
    Yan, Xingjun
    Ji, Guodong
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2015, 49 (22) : 13550 - 13557
  • [46] Treatment Effect of Long-Term Subsurface-Flow Constructed Wetland on Mariculture Water and Analysis of Wetland Bacterial Community
    Chen, Chen
    Yang, Guijun
    Chen, Xuechu
    Li, Pengquan
    Chen, Jingfei
    Yan, Maocang
    Guo, Chong
    WATER, 2024, 16 (07)
  • [47] Long-Term Results for a One-Stage Surgery Technique for Patients With Craniofacial Plexiform Neurofibroma
    Chen, Liangbo
    Guo, Chengrui
    Song, Xuefei
    Yan, Chenxi
    Hu, Xiaojie
    JOURNAL OF CRANIOFACIAL SURGERY, 2018, 29 (08) : E746 - E750
  • [48] CARDIOPULMONARY FUNCTION STUDIES IN LONG-TERM SURVIVORS OF ONE-STAGE BILATERAL LUNG REIMPLANTATION
    KONDO, Y
    CULPEPPER, RD
    TURNER, MD
    HARDY, JD
    JOURNAL OF THORACIC AND CARDIOVASCULAR SURGERY, 1974, 68 (02): : 303 - 308
  • [49] Femoral pseudoarthrosis and knee stiffness: long-term results of a one-stage surgical approach
    Ellera Gomes, Joao L.
    Ruthner, Roberto P.
    Moreira, Luiz
    ARCHIVES OF ORTHOPAEDIC AND TRAUMA SURGERY, 2010, 130 (02) : 277 - 283
  • [50] Femoral pseudoarthrosis and knee stiffness: long-term results of a one-stage surgical approach
    João L. Ellera Gomes
    Roberto P. Ruthner
    Luiz Moreira
    Archives of Orthopaedic and Trauma Surgery, 2010, 130 : 277 - 283