Reliability and efficiency of pollution removal during long-term operation of a one-stage constructed wetland system with horizontal flow

被引:45
|
作者
Jozwiakowski, Krzysztof [1 ]
Bugajski, Piotr [2 ]
Mucha, Zbigniew [3 ]
Wojcik, Wlodzimierz [4 ]
Jucherski, Andrzej [5 ]
Nastawny, Maria [5 ]
Siwiec, Tadeusz [6 ]
Mazur, Andrzej [1 ]
Obroslak, Radomir [1 ]
Gajewska, Magdalena [7 ]
机构
[1] Univ Life Sci Lublin, Dept Environm Engn & Geodesy, Leszczynskiego 7, PL-20069 Lublin, Poland
[2] Agr Univ Krakow, Dept Sanit Engn & Water Management, Al Mickiewicza 24-28, PL-30059 Krakow, Poland
[3] Cracow Univ Technol, Inst Water Supply & Environm Protect, Warszawska 24, PL-31155 Krakow, Poland
[4] Krosno State Coll, Dept Environm Engn, Rynek 1, PL-38400 Krosno, Poland
[5] Inst Technol & Life Sci Falenty, Mt Ctr Studies & Implementat Tylicz, Pulaskiego 25A, PL-33383 Tylicz, Poland
[6] Warsaw Univ Live Sci, Dept Civil Engn, Nowoursynowska 166, PL-02787 Warsaw, Poland
[7] Gdansk Univ Technol, Dept Water & Wastewater Technol, Narutowicza 11-12, PL-80233 Gdansk, Poland
关键词
Reliability; Pollution removal; Wastewater treatment; Constructed wetland; Horizontal flow; SUBSURFACE FLOW; SEWAGE-TREATMENT; WATER; NITROGEN; QUALITY;
D O I
10.1016/j.seppur.2017.06.043
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The paper presents the results of a study of the reliability and efficiency of pollutant removal during long term operation of a one-stage constructed wetland system with horizontal flow. The flow rate of the wastewater treatment plant was 1.2 m(3) d(-1), during the research period. Physical and chemical analyses of raw wastewater and treated effluent were carried out in the years 1997-2010 (14 years). During this study period, 56 series of analyses were performed and 112 wastewater samples were collected. The average efficiencies of BOD5 (Biochemical Oxygen Demand), COD (Chemical Oxygen Demand) and TSS (Total Suspended Solids) removal in the investigated facility during the 14 years of its operation were respectively: 84.7%, 80.9%, and 62.4%. The average values of these parameters in the treated wastewater were significantly lower than the values deemed acceptable by relevant regulations in Poland. The reliabilities of the wastewater treatment plant, based on the Weibull reliability theory for acceptable values of pollution parameters in the effluent of the treatment plant, were as follows: BOD5 - 92%, COD - 98%, TSS - 90%. The conducted analysis showed that the operational reliability of the one-stage horizontal subsurface flow constructed wetland (HSFCW) over the operation period was insufficient according to the Polish standards. Improvement of the reliability of the analyzed system by introduction of additional purification elements, such as irrigated biological beds or a constructed wetland with vertical wastewater flow, was recommended. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:60 / 66
页数:7
相关论文
共 50 条
  • [1] The efficiency and technological reliability of biogenic compounds removal during long-term operation of a one-stage subsurface horizontal flow constructed wetland
    Jozwiakowski, Krzysztof
    Bugajski, Piotr
    Kurek, Karolina
    de Carvalho, Maria de Fatima Nunes
    Almeida, Maria Adelaide Araujo
    Siwiec, Tadeusz
    Borowski, Gabriel
    Czekala, Wojciech
    Dach, Jacek
    Gajewska, Magdalena
    [J]. SEPARATION AND PURIFICATION TECHNOLOGY, 2018, 202 : 216 - 226
  • [2] Technological reliability of pollutant removal in different seasons in one-stage constructed wetland system with horizontal flow operating in the moderate climate
    Jozwiakowski, Krzysztof
    Bugajski, Piotr
    Kurek, Karolina
    Caceres, Rafaela
    Siwiec, Tadeusz
    Jucherski, Andrzej
    Czekala, Wojciech
    Kozlowski, Kamil
    [J]. SEPARATION AND PURIFICATION TECHNOLOGY, 2020, 238
  • [3] Productivity and chemical properties of Salix viminalis in a horizontal subsurface flow constructed wetland during long-term operation
    Listosz, Agnieszka
    Kowalczyk-Jusko, Alina
    Jozwiakowski, Krzysztof
    Marzec, Michal
    Urban, Danuta
    Tokarz, Ewelina
    Ligeza, Slawomir
    [J]. ECOLOGICAL ENGINEERING, 2018, 122 : 76 - 83
  • [4] Enhanced Removal of Organic Matter and Ammonia Nitrogen in a One-Stage Vertical Flow Constructed Wetland System
    Du, Xiaoli
    Xu, Zuxin
    Wang, Sheng
    [J]. ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2010, 29 (01) : 60 - 67
  • [5] Enhanced removal of organic matters and ammonia nitrogen in a one-stage vertical flow constructed wetland system
    Du, Xiaoli
    Xu, Zuxin
    Wang, Sheng
    [J]. JOURNAL OF BIOTECHNOLOGY, 2008, 136 : S639 - S640
  • [6] LONG-TERM TREATMENT EFFICIENCY OF A HORIZONTAL SUBSURFACE FLOW CONSTRUCTED WETLAND AT JIMLIKOV, CZECH REPUBLIC
    Vymazal, Jan
    [J]. ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2014, 13 (01): : 73 - 80
  • [7] Removal of nitrogen from low pollution water by long-term operation of an integrated vertical-flow constructed wetland: Performance and mechanism
    Liu, Ying
    Liu, Xiaohui
    Li, Ke
    Lu, Shaoyong
    Guo, Xiaochun
    Zhang, Jian
    Xi, Beidou
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 652 : 977 - 988
  • [8] Long-Term Performance of a Constructed Wetland for Metal Removal
    Knox, Anna Sophia
    Nelson, Eric A.
    Halverson, Nancy V.
    Gladden, John B.
    [J]. SOIL & SEDIMENT CONTAMINATION, 2010, 19 (06): : 667 - 685
  • [9] Reliability and probability of organic and biogenic pollutants removal in a constructed wetland wastewater treatment plant in the aspect of its long-term operation
    Bugajski, Piotr
    Mucha, Zbigniew
    Jozwiakowska, Karolina
    Mucha, Marzena
    Wojcik, Wlodzimierz
    [J]. DESALINATION AND WATER TREATMENT, 2022, 278 : 13 - 22
  • [10] The influence mechanism of bioclogging on pollution removal efficiency of vertical flow constructed wetland
    Zhu, Yixuan
    Ye, Ping
    Xu, Shirong
    Zhou, Yongchao
    Zhang, Yan
    Zhang, Yiping
    Zhang, Tuqiao
    [J]. WATER SCIENCE AND TECHNOLOGY, 2020, 81 (09) : 1870 - 1881