Simulation Calculation of Concrete Gravity Dam for Xiyu Reservoir During Operation Period

被引:0
|
作者
Ji Dongyu [1 ]
Song Chuncao [2 ]
机构
[1] Hunan Urban Construct Coll, Xiangtan, Peoples R China
[2] North China Univ Water Resources & Elect Power, Zhengzhou, Peoples R China
关键词
Xiyu reservoir; Gravity dam; Operation period; Finite element method; Simulation analysis; FOUNDATION;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Concrete gravity dam is a common hydraulic structure, in order to have a clear understanding for concrete gravity dam in the operating process, researching stress and deformation distribution of concrete gravity dam. This paper adopts the universal finite element calculating software to simulate and calculate concrete gravity dam for Xiyu reservoir during operation period, and gives stress and displacement values on the typical section of gravity dam under the condition during operation period, and analyses calculation results, research results can provides certain theoretical basis for design and construction of concrete gravity dam. The results showed that, in the operating process, stress and deformation values of concrete gravity dam for Xiyu reservoir mainly related to water pressure and earthquake action, but the dam's stress and deformation values are smaller, the stress and deformation values can meet strength and stiffness requirements.
引用
收藏
页码:1171 / +
页数:2
相关论文
共 50 条
  • [1] Simulation of the working behavior of Shibahe reservoir rock-filled concrete gravity dam during construction
    Cheng H.
    Zhou Q.
    Lou S.
    Zhang G.
    Liu Y.
    Lei Z.
    [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (09): : 1408 - 1416
  • [2] Dynamic Simulation Analysis of Temperature Field and Thermal Stress of Concrete Gravity Dam during Construction Period
    Wang, Haibo
    Qiang, Sheng
    Sun, Xiao
    Zheng, Rui
    [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2677 - 2681
  • [3] Safety evaluation of rock-filled concrete gravity dam with long section during the impoundment operation period
    Xu X.
    He T.
    Lei Z.
    Zhang Q.
    Li C.
    Jin F.
    [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (09): : 1375 - 1387
  • [4] Transient Response of Concrete Gravity Dam Considering Dam-Reservoir-Foundation Interaction
    Mandal, Kalyan Kumar
    Maity, Damodar
    [J]. JOURNAL OF EARTHQUAKE ENGINEERING, 2018, 22 (02) : 211 - 233
  • [5] Temperature Stress Analysis for Concrete Gravity Dam in Operating Period
    Dong, Hong
    Han, Juan
    Yang, Hao
    [J]. 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 891 - 895
  • [6] Numerical simulation studies of the gravity dam of Magnesia concrete
    Yang Lu
    Liu Dongbo
    Wang Zhikun
    [J]. ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1973 - 1976
  • [7] An Eulerian approach for dynamic analysis of reservoir adjacent to concrete gravity dam
    Mandal, Kalyan Kumar
    Aziz, Munna
    [J]. SN APPLIED SCIENCES, 2019, 1 (07)
  • [8] An Eulerian approach for dynamic analysis of reservoir adjacent to concrete gravity dam
    Kalyan Kumar Mandal
    Munna Aziz
    [J]. SN Applied Sciences, 2019, 1
  • [9] Operation of the dam of the Bureiskaya HPP during filling of the reservoir
    Durcheva V.N.
    Puchkova S.M.
    [J]. Power Technology and Engineering, 2006, 40 (2) : 71 - 78
  • [10] Simulation Analysis for Concrete Hyperbolic Arch Dam of Gucheng Reservoir
    Ji Dongyu
    Yang Zhichao
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2014, 5 : 1203 - +