Dynamic Simulation Analysis of Temperature Field and Thermal Stress of Concrete Gravity Dam during Construction Period

被引:3
|
作者
Wang, Haibo [1 ]
Qiang, Sheng [1 ]
Sun, Xiao [1 ]
Zheng, Rui [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China
来源
关键词
Concrete Gravity Dam; Thermal Stress; Cooling Pipe Discrete Model; Temperature Control Measures for Cracking Prevention; Numerical Modeling;
D O I
10.4028/www.scientific.net/AMM.90-93.2677
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The basic theory of temperature field and stress field of concrete and 3D FEM combining with cooling pipe discrete model and iteration method are used to carry out the dynamic simulation analysis of the temperature filed and stress field of a concrete gravity dam of South-to-North Water Diversion Project. The impacts on cracking mechanism of the surface insulation, internal cooling and environmental climate are considered in calculation. The change laws of temperature field and thermal stress with time and their distributions are analyzed, reasonable temperature control measures are put forward for reference. The results show that good effect of temperature control and cracking prevention is achieved, the proposed measures should have great reference significance to the similar concrete dam in future.
引用
收藏
页码:2677 / 2681
页数:5
相关论文
共 50 条
  • [1] Temperature Stress Analysis for Concrete Gravity Dam in Operating Period
    Dong, Hong
    Han, Juan
    Yang, Hao
    [J]. 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 891 - 895
  • [2] Simulation and analysis of temperature field and stress field of sluice pier concrete during construction
    Wang, Zhen-Hong
    Zhu, Yue-Ming
    Yu, Shu-Ping
    Wang, Fang-Yong
    [J]. Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2008, 41 (04): : 476 - 481
  • [3] Random thermal creep stress analysis of a concrete gravity dam
    [J]. Shuili Fadian Xuebao, 4 (26-35):
  • [4] Analysis and Back-Analysis for Temperature Field of Concrete Arch Dam During Construction Period Based on Temperature Data Measured by DTS
    Su, Huaizhi
    Li, Jinyou
    Hu, Jiang
    Wen, Zhiping
    [J]. IEEE SENSORS JOURNAL, 2013, 13 (05) : 1403 - 1412
  • [5] Simulation Calculation of Concrete Gravity Dam for Xiyu Reservoir During Operation Period
    Ji Dongyu
    Song Chuncao
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2014, 5 : 1171 - +
  • [6] Thermal stress analysis of concrete wall of LNG tank during construction period
    Zhai, Ximei
    Wang, Yonghui
    Wang, Heng
    [J]. MATERIALS AND STRUCTURES, 2016, 49 (06) : 2393 - 2406
  • [7] Thermal stress analysis of concrete wall of LNG tank during construction period
    Ximei Zhai
    Yonghui Wang
    Heng Wang
    [J]. Materials and Structures, 2016, 49 : 2393 - 2406
  • [8] Simulation and Research on Temperature Field of Taishan Roller Compacted Concrete Gravity Dam
    Zhang, Xiaofei
    Shi, Run
    Dai, Hongbin
    Liu, Qian
    Zhang, Xin
    [J]. 4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 237
  • [9] Simulation of temperature and stress fields during RCC dam construction
    Luna, Ronaldo
    Wu, Yong
    [J]. Journal of Construction Engineering and Management, 2000, 126 (05) : 381 - 388
  • [10] Simulation of temperature and stress fields during RCC dam construction
    Luna, R
    Wu, Y
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (05): : 381 - 388