Optimal Policy Study on Reliability-Centered Preventive Maintenance for a Single-Equipment System

被引:0
|
作者
Liu, Q. M. [1 ]
Dong, M. [1 ]
Lv, W. Y. [2 ]
机构
[1] Shanghai Jiao Tong Univ, Antai Coll Econ & Management, Shanghai 200240, Peoples R China
[2] Shanghai Univ Sci & Technol, Sch Business, Shanghai 200240, Peoples R China
关键词
MACHINE;
D O I
10.1007/978-3-319-09507-3_85
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Because of demanding higher operational efficiency and safety in industrial systems, system maintenance trends to the direction of high speed, high load and high automation. Reliability-centered preventive maintenance schedule plays an important role in production, but it is always a complex task to make such a plan. In this paper, the optimization of reliability-centered preventive maintenance (PM) for a single-equipment system can be proposed. In order to reduce downtime loss, several PM actions are performed together using the threshold for opportunity PM. By using Markov decision process method, the transition probability matrix for different PM actions can be obtained, and then the optimal combination problem on PM strategy can be developed. Finally, the optimal PM schedule which can provide the desired levels of reliability to a single-component system and minimize maintenance cost can be obtained. A case is used to demonstrate the implementation and potential applications of the proposed method.
引用
收藏
页码:995 / 1002
页数:8
相关论文
共 50 条
  • [31] Reliability-centered maintenance on the Space Shuttle Program
    Hauge, BS
    Stevens, AM
    Loomis, RJ
    Ghose, A
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM - 2000 PROCEEDINGS, 2000, : 311 - 316
  • [33] Optimal periodic preventive maintenance policy for leased equipment
    Pongpech, J.
    Murthy, D. N. P.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (07) : 772 - 777
  • [34] Reliability-Centered Maintenance for Overhead Transmission Lines in Composite Power System
    Abbasghorbani, Morteza
    Damchi, Yaser
    Rajabi Mashhadi, Habib
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2022, 2022
  • [35] Preliminary Study on Reliability-centered Maintenance of High-speed Train
    Wang, Huasheng
    Zhang, Lin
    Ma, Xiaobing
    Wen, Li
    PROCEEDINGS OF 2009 8TH INTERNATIONAL CONFERENCE ON RELIABILITY, MAINTAINABILITY AND SAFETY, VOLS I AND II: HIGHLY RELIABLE, EASY TO MAINTAIN AND READY TO SUPPORT, 2009, : 633 - +
  • [36] Reducing maintenance workload through reliability-centered maintenance (RCM)
    Jacobs, KS
    NAVAL ENGINEERS JOURNAL, 1998, 110 (04) : 89 - 97
  • [37] Reliability-Centered Maintenance Using Reliability Parameters on Gas Compressors
    Omozuhiomwen, Gregory Egbe
    Kure, Halima I.
    Obi, Emenike Raymond
    Ebenuwa, Solomon H.
    Ijemaru, Gerald K.
    Nwajana, Augustine O.
    INTERNATIONAL JOURNAL OF MANUFACTURING MATERIALS AND MECHANICAL ENGINEERING, 2025, 14 (01)
  • [38] A Reliability-Centered Maintenance Study for an Individual Section-Forming Machine
    Okwuobi, Samuel
    Ishola, Felix
    Ajayi, Oluseyi
    Salawu, Enesi
    Aworinde, Abraham
    Olatunji, Obafemi
    Akinlabi, Stephen A.
    MACHINES, 2018, 6 (04)
  • [39] Reliability-Centered Maintenance for Off-Highway Truck: Case Study of Sungun Copper Mine Operation Equipment
    Morad, Amin Moniri
    Pourgol-Mohammad, Mohammad
    Sattarvand, Javad
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2013, VOL 15, 2014,
  • [40] Criticality-based reliability-centered maintenance for healthcare
    Shamayleh, Abdulrahim
    Awad, Mahmoud
    Abdulla, Aidah Omar
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2020, 26 (02) : 311 - 334