A (r, r, Q) inventory model for spare parts involving equipment criticality

被引:22
|
作者
Chang, PL
Chou, YC
Huang, MG
机构
[1] Feng Chia Univ, Dept Business Adm, Taichung, Taiwan
[2] Tunghai Univ, Dept Business Adm, Taichung, Taiwan
[3] Shih Chien Univ, Dept Finance, Taipei, Taiwan
关键词
spare parts; inventory policy; equipment criticality; demand classes;
D O I
10.1016/j.ijpe.2004.06.048
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Demand for spare parts can sometimes be classified into critical and non-critical demand, depending on the criticality of the equipment for production. To effectively handle this situation in spare parts inventory control, we propose a (r, r, Q) inventory model for spare parts where some of the stock is reserved for critical demand. A solution procedure to determine the reorder point r, which is equal to the critical level, and the reorder quantity Q is presented. Finally, some numerical examples of the spare parts of semiconductor equipment are presented to illustrate the results of using the proposed policy. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:66 / 74
页数:9
相关论文
共 50 条
  • [31] A proactive event-driven decision model for joint equipment predictive maintenance and spare parts inventory optimization
    Bousdekis, Alexandros
    Papageorgiou, Nikos
    Magoutas, Babis
    Apostolou, Dimitris
    Mentzas, Gregoris
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE IN THROUGH-LIFE ENGINEERING SERVICES, 2017, 59 : 184 - 189
  • [32] A (Q,R) inventory replenishment model with two delivery modes
    Perez, Cinthia
    Geunes, Joseph
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (02) : 528 - 545
  • [33] SENSITIVITY OF (Q,R) INVENTORY MODEL TO PENALTY COST PARAMETER
    DAS, C
    NAVAL RESEARCH LOGISTICS, 1975, 22 (01) : 175 - 179
  • [34] A MINMAX DISTRIBUTION FREE PROCEDURE FOR THE (Q, R) INVENTORY MODEL
    GALLEGO, G
    OPERATIONS RESEARCH LETTERS, 1992, 11 (01) : 55 - 60
  • [35] Development of a simulation model for the supply of spare parts for heating equipment
    Lvovich, I. Ya
    Preobrazhenskiy, A. P.
    Choporov, O. N.
    INTERNATIONAL CONFERENCE ON CONSTRUCTION, ARCHITECTURE AND TECHNOSPHERE SAFETY (ICCATS 2020), 2020, 962
  • [36] Simulations on the Spare Parts Inventory Management of Equipment Maintenance in manufacturing enterprise based on Flexsim
    Sun, Xue
    ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 3181 - 3186
  • [37] Joint optimization decision of equipment condition-based maintenance and spare parts inventory
    Lu C.
    Xu T.
    Wang H.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2019, 41 (07): : 1560 - 1567
  • [38] The criticality of spare parts evaluating model using artificial neural network approach
    Wang, Lin
    Zeng, Yurong
    Zhang, Jinlong
    Huang, Wei
    Bao, Yukun
    COMPUTATIONAL SCIENCE - ICCS 2006, PT 1, PROCEEDINGS, 2006, 3991 : 728 - 735
  • [39] INVENTORY MANAGEMENT IN A (Q,r) INVENTORY MODEL WITH TWO DEMAND CLASSES AND FLEXIBLE DELIVERY
    Huang, Shuo
    Liao, Bo
    Robb, David J.
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2011, 7 (03): : 1243 - 1254
  • [40] Research on Equipment Spare Parts Quasi-three-stage Inventory Model of Three-echelon Assembly Relationship
    Sun, Jiangsheng
    Li, Wanling
    Lv, Yanmei
    Zhang, Lianwu
    2009 SECOND INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING: KAM 2009, VOL 2, 2009, : 107 - +