共 50 条
- [31] A Simple and Reliable Algorithm for Computing Boundaries of Power Flow Solutions due to System Uncertainties [J]. 2009 IEEE BUCHAREST POWERTECH, VOLS 1-5, 2009, : 210 - +
- [32] Computation of Cross-coupling for Reliable System Operation [J]. 2012 THIRD INTERNATIONAL CONFERENCE ON EMERGING SECURITY TECHNOLOGIES (EST), 2012, : 141 - 144
- [33] Coordination of Digital Excitation System Settings for Reliable Operation [J]. 2009 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-8, 2009, : 503 - 509
- [34] COORDINATION OF DIGITAL EXCITATION SYSTEM SETTINGS FOR RELIABLE OPERATION [J]. CONFERENCE RECORD OF 2011 ANNUAL IEEE PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE (PPIC), 2011, : 112 - 119
- [36] RELIABLE CONTROL OF NUCLEAR-POWER-PLANTS [J]. CONTROL-THEORY AND ADVANCED TECHNOLOGY, 1992, 8 (03): : 547 - 566
- [37] Memory Controller with Adaptive ECC for Reliable System Operation [J]. 2023 36TH SBC/SBMICRO/IEEE/ACM SYMPOSIUM ON INTEGRATED CIRCUITS AND SYSTEMS DESIGN, SBCCI, 2023, : 125 - 130
- [38] PNEUMATICS THE SAFE AND RELIABLE APPROACH TO POWER AND CONTROL [J]. ENGINEERING, 1981, 221 (10): : 763 - 766
- [39] PROBLEMS OF DEVELOPING RELIABLE AUTOMATED CONTROL-SYSTEM FOR BLAST-FURNACE OPERATION [J]. STEEL IN THE USSR, 1982, 12 (09): : 401 - 403
- [40] Operation & Maintenance - The Key for Reliable Performance in a CPV Power Plant [J]. 14TH INTERNATIONAL CONFERENCE ON CONCENTRATOR PHOTOVOLTAIC SYSTEMS (CPV-14), 2018, 2012