共 50 条
- [2] Optimization of the start-up procedure of a combined cycle power plant [J]. PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1841 - +
- [3] Optimization of start-up process in combined cycle steam turbine of a power plant [J]. Ding, Y. (dyj1987214@126.com), 1600, Chinese Society for Electrical Engineering (33):
- [4] Dynamic optimization method for start-up scheduling of a combined cycle power plant [J]. Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2002, 68 (672): : 2377 - 2384
- [5] Start-Up Optimization of Combined Cycle Power Plants: A Field Test in a Commercial Power Plant [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (03):
- [8] START-UP OPERATION STRATEGY OPTIMIZATION OF THE SOLAR FIELD FOR A PARABOLIC TROUGH CONCENTRATED SOLAR POWER PLANT [J]. PROCEEDINGS OF ASME POWER APPLIED R&D 2023, POWER2023, 2023,
- [9] Analysis and optimization of the start-up process based on Badaling solar power tower plant [J]. INTERNATIONAL CONFERENCE ON CONCENTRATING SOLAR POWER AND CHEMICAL ENERGY SYSTEMS, SOLARPACES 2014, 2015, 69 : 1688 - 1695