Reliability of bond measuring devices in pretensioned prestressed concrete

被引:0
|
作者
Weerasekera, I. R. A. [1 ]
Sabesh, A. [1 ]
Loov, R. E. [2 ]
机构
[1] Univ Moratuwa, Dept Civil Engn, Moratuwa, Sri Lanka
[2] Univ Calgary, Dept Civil Engn, Calgary, AB, Canada
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One of the major deficiencies in prestressed concrete bond research is the absence of a standard method for determining bond strength. This makes comparisons between different investigations and bond values difficult. In this study, the concrete strains were measured through the utilization of demec points at the outer surface of the concrete and strand strains were measured by using resistance strain gauges that were mounted on individual wires of the seven-wire strand. Each method has its own merits and demerits. This paper presents a summary of an experimental investigation that was conducted to determine the reliability of bond measuring devices in pretensioned prestressed concrete. Use of resistance strain gauges in measurements provides instantaneous results as opposed to the time consuming nature of the demec gauge measurements. In this experimental programme an attempt has been made to ascertain the reliability of these measurements by applying both.
引用
收藏
页码:333 / +
页数:2
相关论文
共 50 条
  • [21] Characterization of Bond-Loss Failures in Pretensioned Concrete Girders
    Naji, Behnam
    Ross, Brandon E.
    Floyd, Royce W.
    JOURNAL OF BRIDGE ENGINEERING, 2017, 22 (04)
  • [22] BOND FATIGUE TESTS OF BEAMS SIMULATING PRETENSIONED CONCRETE CROSSTIES
    KAAR, PH
    HANSON, NW
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1975, 20 (05): : 65 - 80
  • [23] RELIABILITY ASSESSMENT OF PRESTRESSED CONCRETE BEAMS
    ALHARTHY, AS
    FRANGOPOL, DM
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1994, 120 (01): : 180 - 199
  • [24] Long-term performance of prestressed, pretensioned high strength concrete bridge girders
    Roller, JJ
    Russell, HG
    Bruce, RN
    Martin, BT
    PCI JOURNAL, 1995, 40 (06): : 48 - 59
  • [25] ELASTIC STRESSES IN CRACKED PRESTRESSED PRETENSIONED CONCRETE COMPOSITE BEAMS WITH BONDED TENDONS.
    Janko, L.
    Acta Technica (Budapest), 1982, 95 (1-4): : 63 - 82
  • [26] Time-dependent evolution of strand transfer length in pretensioned prestressed concrete members
    Caro, L. A.
    Marti-Vargas, J. R.
    Serna, P.
    MECHANICS OF TIME-DEPENDENT MATERIALS, 2013, 17 (04) : 501 - 527
  • [27] Strand bond performance in prestressed concrete accounting for bond slip
    Marti-Vargas, J. R.
    Serna, P.
    Hale, W. M.
    ENGINEERING STRUCTURES, 2013, 51 : 236 - 244
  • [28] Predicting bond formulations for prestressed concrete elements
    Pellegrino, Carlo
    Zanini, Mariano Angelo
    Faleschini, Flora
    Corain, Livio
    ENGINEERING STRUCTURES, 2015, 97 : 105 - 117
  • [29] Concrete splitting and bond in prestressed concrete beams with indented wires
    Gálvez, JC
    Tork, B
    Cendón, DA
    Planas, J
    FRACTURE MECHANICS OF CONCRETE STRUCTURES, VOLS 1 AND 2, 2001, : 557 - 563
  • [30] RELIABILITY OF MEASURING DEVICES
    TSEITLIN, VG
    MEASUREMENT TECHNIQUES-USSR, 1966, (03): : 312 - &