Quantifying the impacts of rework, schedule pressure, and ripple effect loops on project schedule performance

被引:8
|
作者
Jalili, Yasaman [1 ]
Ford, David N. [1 ]
机构
[1] Texas A&M Univ, Zachry Dept Civil Engn, College Stn, TX 77843 USA
关键词
SYSTEM DYNAMICS MODELS; CONSTRUCTION PROJECTS; PRODUCT DEVELOPMENT;
D O I
10.1002/sdr.1551
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
[No abstract available]
引用
收藏
页码:82 / 96
页数:15
相关论文
共 50 条
  • [1] Rework and schedule performance A profile of incidence, impact, causes and solutions
    Hwang, Bon-Gang
    Yang, Shimin
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (02) : 190 - +
  • [2] A Critical Design Structure Method for Project Schedule Development under Rework Risks
    Ma, Guofeng
    Jia, Jianyao
    Zhu, Tiancheng
    Jiang, Shan
    [J]. SUSTAINABILITY, 2019, 11 (24)
  • [3] Effect of project complexity on cost and schedule performance in transportation projects
    Nguyen, Long D.
    Long Le-Hoai
    Tran, Dai Q.
    Dang, Chau N.
    Nguyen, Chau V.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2019, 37 (07) : 384 - 399
  • [4] The 'ripple effect' of schedule control: a social network approach
    McAlpine, Kristie L.
    [J]. COMMUNITY WORK & FAMILY, 2015, 18 (04) : 377 - 394
  • [5] The relative impacts of selected practices on project cost and schedule
    Lee, Sang-Hoon
    Thomas, Stephen R.
    Tucker, Richard L.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (05) : 545 - 553
  • [6] Effects of schedule pressure on construction performance
    Nepal, MP
    Park, M
    Son, B
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (02): : 182 - 188
  • [7] THE IMPACTS OF REGULATORY INTERVENTION - QUANTIFYING THE RIPPLE EFFECT
    MALONEY, S
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 49 (JUN): : 315 - 317
  • [8] AN INFORMATION-THEORETIC MODEL OF PROJECT SCHEDULE OVERRUNS CAUSED BY TASK REWORK: A CASE FOR NEWSPEAK
    Rooney, Warren
    Allaire, Douglas
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2016, VOL 1B, 2016,
  • [9] Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects
    Shrestha, Pramen P.
    Fathi, Medya
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (03)
  • [10] Effect of Schedule Compression on Project Effort in COCOMO II Model for Highly Compressed Schedule Ratings
    Hussain, Sharraf
    Khoja, Shakeel A.
    Hassan, Nazish
    Lohana, Parkash
    [J]. WIRELESS NETWORKS, INFORMATION PROCESSING AND SYSTEMS, 2008, 20 : 202 - +