Research, Management and Implementation of the Nuclear Power Equipments' Lifecycle

被引:0
|
作者
Fu, Zhen-Xu [1 ]
Qu, Jian-Glin [1 ]
Zhang, Zheng-Shi [1 ]
机构
[1] CGN Power Co Ltd, Ctr Informat Technol, Shenzhen 518124, Peoples R China
关键词
Equipment; Whole Lifecycle; Electronization; Manage and Control;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the development of the nuclear power industry, the variety and quantity of the related equipments have been increased continously. How to make the effective, convenient control and management of these equipments became an urgent task. The goal of this article is to develop and construct an effective management method of the equipments, to collect and sort the related information from the production to the scrap of the equipment. To set up the perfect life information database for those important system and equipment. To establish an integrative monitoring electronic platform, managing, recording and tracking the detailed information of all the equipments including their mold, application range, maintenance information, and the vendor information etc.
引用
收藏
页码:539 / 543
页数:5
相关论文
共 50 条
  • [31] History knowledge management in lifecycle of product development and its implementation
    Zhong, PS
    Liu, DZ
    Liu, M
    Ding, SH
    Sun, ZY
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS 1 AND 2, 2005, : 1205 - 1210
  • [32] An Implementation Strategy of Evidence-Based Application Lifecycle Management
    Kim, Jeong Ah
    Choi, SeungYong
    SECURITY-ENRICHED URBAN COMPUTING AND SMART GRID, 2010, 78 : 560 - +
  • [33] Integrated product model to support implementation of product lifecycle management
    College of Mechanical and Energy Engineering, Zhejiang University, Hangzhou 310027, China
    Zhejiang Daxue Xuebao (Gongxue Ban), 2008, 3 (418-424):
  • [34] Research and Implementation of Portlet Management Tools for Power Grid Business
    Liu, XianMing
    Zhan, MingYan
    Li, Min
    Zhou, QingYun
    Yu, PengFei
    2011 AASRI CONFERENCE ON ENVIRONMENTAL MANAGEMENT AND ENGINEERING, (AASRI-EME 2011), VOL 2, 2011, : 119 - 123
  • [35] STOCHASTIC APPROACH FOR THE SEISMIC DESIGN OF NUCLEAR-POWER-PLANT EQUIPMENTS
    LABBE, P
    NOE, H
    NUCLEAR ENGINEERING AND DESIGN, 1991, 129 (03) : 367 - 379
  • [36] Implementation of Positioning Management System for Improtant Equipments based on Internet of Things
    Yang, Yan
    PROCEEDINGS OF 2016 10TH INTERNATIONAL CONFERENCE ON COMPLEX, INTELLIGENT, AND SOFTWARE INTENSIVE SYSTEMS (CISIS), 2016, : 473 - 476
  • [37] PRESENT SITUATION AT DEVELOPMENT OF MAIN EQUIPMENTS OF NUCLEAR-POWER PLANTS
    HORVATH, LG
    ENERGIA ES ATOMTECHNIKA, 1974, 27 (11): : 520 - 530
  • [38] Methods for calculation of HCLPF value for structures and equipments in nuclear power plants
    Cai, Feng-Chun
    Ye, Xian-Hui
    Liu, Wen-Jin
    Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (SUPPL.1): : 152 - 156
  • [39] Implementation of Systems Engineering Model into Product Lifecycle Management Platform
    Li, Shuning
    El-Mounayri, Hazim
    Zhang, Weijie
    Schindel, Bill
    Sherey, Jason
    PRODUCT LIFECYCLE MANAGEMENT IN THE ERA OF INTERNET OF THINGS, PLM 2015, 2016, 467 : 601 - 608
  • [40] Computerized blocking assistance of the equipments in Daya Bay Nuclear Power Station
    Information Technology Center, Daya Bay Nuclear Power Operations and Management Co. Ltd., Shenzhen 518124, China
    不详
    Harbin Gongye Daxue Xuebao, 2006, 8 (1386-1388+1398):