共 39 条
- [32] Vision sensing weld seam tracking system for pipeline girth-welding robot [J]. Proceedings of the 24th Chinese Control Conference, Vols 1 and 2, 2005, : 1519 - 1521
- [35] Model Test Investigation on a J-lay System Designed for Deepwater Pipeline Installation in South China Sea [J]. APPLIED MECHANICS AND MECHANICAL ENGINEERING II, PTS 1 AND 2, 2012, 138-139 : 484 - +
- [36] Non-linear finite element analysis of a Ti6Al4V/Inconel 625 joint obtained by explosion welding for sub-sea applications [J]. UNDERWATER TECHNOLOGY, 2021, 38 (01): : 13 - 16
- [37] Internal corrosion protection for high pressure sub-sea pipelines in water injection system at off-shore oil field "white tiger" [J]. PROCEEDINGS OF THE SECOND (1999) ISOPE EUROPEAN OFFSHORE MECHANICS SYMPOSIUM: PIPELINES: CONSTRUCTION AND OPERATIONS, ENVIRONMENTS AND DATABASE, ENGINEERING AND DESIGN, MATERIALS, 1999, : 74 - 75
- [38] Welding robot system for sub-assembly in shipbuilding using design data from 3-dimensional CAD system [J]. Robot, 122 (22-26):
- [39] The adaptation of a gantry-robot, operating in a Railway Industry Co., to allow the installation on the robot head of a very advanced sensing system, whose integration has highly improved welding and milling operations, made by the same robot. [J]. IECON '98 - PROCEEDINGS OF THE 24TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOLS 1-4, 1998, : 2132 - 2136