Welding robot system applied in sub-sea pipeline-installation

被引:4
|
作者
Luo Yu [1 ]
Jiao Xiangdong [1 ]
Zhou Canfeng [1 ]
Chen Jiaqing [1 ]
Han Suxin [1 ]
机构
[1] Beijing Inst Petrochem Technol, Beijing Higher Inst Engn Res Ctr Energy Engn Adv, Beijing, Peoples R China
关键词
EtherCAT; Pipeline welding robot; Sea-trial; Sub-sea pipeline installation; Synchronization control; Welding process;
D O I
10.1108/IR-06-2014-0360
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The aim of this study was to develop a new generation of automatic systems based on cutting-edge design and practical welding physics to minimize downtime caused by defects and machine faults on the barges. Automatic welding has been used frequently on offshore pipeline projects. Design/methodology/approach - An automated welding robot system for sub-sea pipeline installation was constructed. The system utilized the double-car double-torch welding, which is light-weight and compact, suited for offshore applications. Several state-of-the-art technologies were integrated into the control system design, including a heterogeneous network based on EtherCAT technology, network communications based on CANopen, motor synchronization, all-position welding, etc. In addition, the utilization of the CAN bus reduced the number of cable lines and increased the extensibility of the proposed welding robot system. An internal clamp with copper shoes assured a nice root weld and narrow bevel design and the welding efficiency was improved accordingly. Findings - The trial was carried out to verify the rationality and effectiveness of the proposed automated system. The deposition rate of the backing welding could reach 17.78 kg/h; the average time for each welding was 340 s. This system was unique in that it features a dual-torch welding head that allowed for the deposition of one run with twice as much material as a single torch head. The experiment showed that the double-vehicle double-torch mode can greatly improve the welding efficiency of pipeline installation during the welding process. Research limitations/implications - The automated welding robot system will be applied to offshore pipeline projects. Originality/value - This robot is the first submarine pipeline installation welding robot to use a heterogeneous network based on EtherCAT technology. Various aspects of the submarine pipeline installation welding robot's design and performance were discussed, including mechanical body design, control system design and welding process specification.
引用
收藏
页码:83 / 92
页数:10
相关论文
共 39 条
  • [1] Sea-water hydraulics applied to a sub-sea pipeline repair system.
    Skar, K
    [J]. PROCEEDINGS OF THE 47TH NATIONAL CONFERENCE ON FLUID POWER, VOL II, 1996, : 205 - 219
  • [2] Sub-sea pipeline protection
    不详
    [J]. ANTI-CORROSION METHODS AND MATERIALS, 2000, 47 (02) : 109 - 109
  • [3] MONITORING CAMPAIGN ON SUB-SEA INSTALLATION
    Navarro, Jesus Rodriguez
    van Drunen, Joris
    de Bruin, Ruben
    [J]. PROCEEDINGS OF THE ASME 31ST INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARTIC ENGINEERING, VOL 1, 2012, : 297 - 305
  • [4] Study on sub-sea pipeline laying welding station designed on the basis of CAN-bus
    Zhou, Can-Feng
    Jiao, Xiang-Dong
    Ji, Wen-Gang
    Luo, Yu
    Ji, Yi-Peng
    Li, Zhi-Gang
    Zhao, Dong-Yan
    Cao, Jun
    [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2012, 46 (SUPPL. 1): : 72 - 75
  • [5] The DODT Tool Applied to Sub-Sea Software
    Stalhane, Tor
    Wien, Tormod
    [J]. 2014 IEEE 22ND INTERNATIONAL REQUIREMENTS ENGINEERING CONFERENCE (RE), 2014, : 420 - 427
  • [6] Numerical and experimental procedure for designing sub-sea installation operations
    Fujarra A.L.C.
    Tannuri E.A.
    Pereira F.R.
    Madureira R.M.L.
    Masetti I.Q.
    Igreja H.
    [J]. Marine Systems and Ocean Technology, 2010, 5 (02) : 75 - 90
  • [7] Automatic Hyperbaric Welding of Sub-sea Pipelines Repair
    Zhou, Canfeng
    Jiao, Xiangdong
    Xue, Long
    Chen, Jiaqing
    Fang, Xiaoming
    [J]. MANUFACTURING PROCESS TECHNOLOGY, PTS 1-5, 2011, 189-193 : 3478 - +
  • [8] Study and design of a deepwater sub-sea pipeline collet connector
    Wang, Liquan
    An, Shaojun
    Wang, Gang
    [J]. Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2011, 32 (09): : 1103 - 1107
  • [9] Development of a hydrate formation prediction model for sub-sea pipeline
    Abbasi, Aijaz
    Hashim, Fakhruldin Mohd
    [J]. PETROLEUM SCIENCE AND TECHNOLOGY, 2017, 35 (05) : 443 - 450
  • [10] The CMEKF method for sub-sea pipeline monitoring and leak detection
    Bai, L
    Yue, QJ
    Cui, L
    Li, HS
    Jin, ZY
    Wang, QG
    [J]. CHINA OCEAN ENGINEERING, 2004, 18 (04) : 527 - 535