Reconciling strategy towards construction site selection-layout for coal-fired power plants

被引:3
|
作者
Song, Xiaoling [1 ,2 ]
Xu, Jiuping [3 ]
Zhang, Zhe [1 ]
Shen, Charles [2 ]
Xie, Heping [3 ]
Pena-Mora, Feniosky [2 ]
Wu, Yimin [4 ]
机构
[1] Nanjing Univ Sci & Technol, Dept Management Sci & Engn, Nanjing 210094, Jiangsu, Peoples R China
[2] Columbia Univ, Dept Civil Engn & Engn Mech, Adv ConsTruct & InfOrmat TechNol ACT Lab, New York, NY 10027 USA
[3] Sichuan Univ, Inst New Energy & Low Carbon Technol, Chengdu 610064, Sichuan, Peoples R China
[4] State Power Corp, Southwest Elect Power Design Inst, Chengdu 610081, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
Reconciling strategy; Coal-fired power plants; Site selection; Site layout planning; Conflicts; MULTIOBJECTIVE DECISION-MAKING; FUZZY RANDOM-VARIABLES; MODEL; OPTIMIZATION; FRAMEWORK; LOCATION; GIS; ENVIRONMENT; CONFLICT; SYSTEMS;
D O I
10.1016/j.apenergy.2017.07.091
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
There is an increasing debate on a new coal-fired power plant (CPP) construction over a demanding economic development and pressing environmental issues. A fundamental spatial analysis is required to identify potentially suitable sites, select a site and design a layout plan that are crucial for a sustainable energy development. The site selection and layout planning problems are mutually dependent. The different selection of the sites may lead to variations in the site layout plan, and vice versa. A proper site selection-layout planning solution is vital to the environmental, economic and social performances of a coal-fired thermal energy system. This study proposes a reconciling strategy to address the site selection and layout planning problems simultaneously. In specific, three types of conflicts in the site selection and layout planning processes are deliberately identified and quantified. To reconcile the conflicts, address practical constraints, and arrive at a "win-win" solution, three mechanisms are introduced and a bi-level multi-objective optimization model is established. Subsequently, a bi-level particle swarm optimization (BiPSO) is developed to generate an appropriate CPP site for the project owner and design an efficient site layout plan for the specialty subcontractor. The reconciling strategy is able to settle an agreement between the project owner and the subcontractor. To validate the applicability of the proposed method, a being-constructed CPP in China is used as a case study. The results demonstrate that it is an effective, robust and systematic method for decision makers to conduct a proper spatial analysis.
引用
收藏
页码:846 / 865
页数:20
相关论文
共 50 条
  • [1] Fuzzy optimization of the site selection for coal-fired power plants
    Beijing Key Laboratory of Safe and Clean Energy Technology, Department of Thermal Power Engineering, North China Electric Power University, Beijing 102206, China
    Zhongguo Dianji Gongcheng Xuebao, 2006, 24 (82-87):
  • [2] Coal-Fired Power Plants
    Peter Pauls
    热力透平, 2004, (02) : 105 - 107
  • [3] Coal-Fired Power Plants Alternative Petcoke Fired Power Plants
    Ozcelik, Ozlem
    Boran, Kurtulus
    JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2016, 19 (04): : 531 - 535
  • [4] Coal ... Coal-fired power plants for the future
    Heyn, Klaus
    Brennstoff-Waerme-Kraft, 1999, 51 (5-6): : 18 - 24
  • [5] Coal-Fired Power Plants of Japan
    A. N. Tugov
    I. V. Artemeva
    Power Technology and Engineering, 2024, 58 (4) : 644 - 653
  • [6] Tribology in coal-fired power plants
    Moumakwa, DO
    Marcus, K
    TRIBOLOGY INTERNATIONAL, 2005, 38 (09) : 805 - 811
  • [7] Future coal-fired power plants
    Pruschek, R
    BWK, 2001, 53 (12): : 40 - +
  • [8] Advanced coal-fired power plants
    Ruth, LA
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2001, 123 (01): : 4 - 9
  • [9] Modern coal-fired power plants
    Scheffknecht, G
    Stamatelopoulos, GN
    Lorey, H
    BWK, 2002, 54 (06): : 46 - +
  • [10] Measurement Solutions in Coal-fired Power Plants
    Gagg, Richard
    Stuart, Derek
    Hauer, Randy
    POWER ENGINEERING, 2010, 114 (11) : 136 - +