An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times

被引:7
|
作者
Kalczynski, Pawel J. [2 ]
Kamburowski, Jerzy [1 ]
机构
[1] Univ Toledo, Dept Informat Operat & Technol Management, Coll Business & Innovat, Toledo, OH 43606 USA
[2] Calif State Univ Fullerton, Steven G Mihaylo Coll Business & Econ, Fullerton, CA 92834 USA
关键词
Scheduling; Sequencing; Heuristic; Simulation; Optimality; Optimality rate; POLYNOMIAL-APPROXIMATION SCHEME; PROBABILISTIC ANALYSIS; SEQUENCING SUBJECT; MAXIMUM LATENESS; ALGORITHM; MAKESPAN;
D O I
10.1016/j.cor.2012.01.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The theoretical analysis of heuristics for solving intractable optimization problems has many well-known drawbacks. Constructed instances demonstrating an exceptionally poor worst-case performance of heuristics are typically too peculiar to occur in practice. Theoretical results on the average-case performance of most heuristics could not be established due to the difficulty with the use of probabilistic analysis. Moreover, the heuristics for which some type of asymptotic optimality has been proven are likely to perform questionably in practice. The purpose of this paper is to confront known theoretical results with our empirical results concerning heuristics for solving the strongly NP-hard problem of minimizing the makespan in a two-machine flow shop with job release times. The heuristics' performance is examined with respect to their average and maximum relative errors, as well as their optimality rate, that is, the probability of being optimal. In particular, this allows us to observe that the asymptotic optimality rate of so called "almost surely asymptotically optimal" heuristic can be zero. We also present a new heuristic with short worst-case running time and statistically prove that it outperforms all heuristics known so far. However, our empirical experiments reveal that the heuristic is on average slower that its competitors with much longer worst-case running times. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2659 / 2665
页数:7
相关论文
共 50 条
  • [21] Cyclic flow shop scheduling problem with two-machine cells
    Bozejko, Wojciech
    Gnatowski, Andrzej
    Idzikowski, Radoslaw
    Wodecki, Mieczyslaw
    ARCHIVES OF CONTROL SCIENCES, 2017, 27 (02): : 151 - 167
  • [22] The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times
    Matsveichuk, N. M.
    Sotskov, Y. N.
    Werner, F.
    OPTIMIZATION, 2011, 60 (12) : 1493 - 1517
  • [23] On two-machine Flow Shop Scheduling Problem with disjoint setups
    Gnatowski, Andrzej
    Rudy, Jaroslaw
    Idzikowski, Radoslaw
    2020 IEEE 15TH INTERNATIONAL CONFERENCE OF SYSTEM OF SYSTEMS ENGINEERING (SOSE 2020), 2020, : 277 - 282
  • [24] The two-machine total completion time flow shop problem
    DellaCroce, F
    Narayan, V
    Tadei, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 227 - 237
  • [25] A two-machine permutation flow shop scheduling problem with buffers
    Smutnicki, C
    OR SPEKTRUM, 1998, 20 (04) : 229 - 235
  • [26] Two-machine flow shop problem with effects of deterioration and learning
    Wang, Ji-Bo
    Liu, Li-Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) : 1114 - 1121
  • [27] Two-machine flow shop scheduling with linear decreasing job deterioration
    Wang, Ji-Bo
    Liu, Li-Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) : 1487 - 1493
  • [28] Inverse scheduling: two-machine flow-shop problem
    Brucker, Peter
    Shakhlevich, Natalia V.
    JOURNAL OF SCHEDULING, 2011, 14 (03) : 239 - 256
  • [29] Robust scheduling of a two-machine flow shop with uncertain processing times
    Kouvelis, P
    Daniels, RL
    Vairaktarakis, G
    IIE TRANSACTIONS, 2000, 32 (05) : 421 - 432
  • [30] Robust scheduling of a two-machine flow shop with uncertain processing times
    Kouvelis, Panos
    Daniels, Richard L.
    Vairaktarakis, George
    IIE Transactions (Institute of Industrial Engineers), 2000, 32 (05): : 421 - 432