Experimental and Numerical Investigation on the Behaviour of Prestressed High Strength Concrete Pile-to-pile Cap Connections

被引:13
|
作者
Yang, Zhijian [1 ]
Wang, Wenjin [2 ]
机构
[1] Shenyang Jianzhu Univ, Sch Civil Engn, Shenyang 110168, Peoples R China
[2] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
关键词
PHC piles; pile-cap connections; hysteretic behaviour; energy dissipation; seismic performance; SEISMIC PERFORMANCE; DECK CONNECTIONS; PRECAST;
D O I
10.1007/s12205-015-0658-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Six Prestressed High Strength Concrete (PHC) pile-to-pile cap connections were tested to evaluate their damage process and failure modes under low cyclic loading. The hysteretic behaviour, rotation angle, ductility and bearing capacity were observed and analyzed. In addition, the effect of connecting forms and cutting-off piles on seismic performance of pile-cap connections was considered and investigated. The experimental results showed that flexural bending failure occurred in all connections. There were two main failure modes. One was tensile rupturing of prestressed bars and headings, resulting in loss of bearing capacity of the connections. The other type was more severe damage due to anchor bar yield and appearance of plastic hinge. Moreover, bond-slip failure of anchor bars was not observed in the cap, and the length of anchor bars met requirements. The analysis indicated that the bearing capacity and energy dissipation capacity increased along with the rotation capacity of the pile connections. Nonlinear finite element models were established to analyze the mechanical properties of these connections using OpenSees. The load-displacement curves obtained from the numerical analysis agreed with the experimental results. The effects of various parameters on the behaviour of the connections were conducted based on the numerical model.
引用
收藏
页码:1903 / 1912
页数:10
相关论文
共 50 条
  • [21] Effect of Hinge-Type Connections on the Lateral Cyclic Behavior of a Prestressed High-Strength Concrete Pile
    Lim, B.
    Kang, J. W.
    Kim, Y. J.
    Yoon, H.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 1123 - 1130
  • [22] FLEXURAL STRENGTH OF REINFORCED CONCRETE PILE CAP.
    Shen Jinghua
    Jiang Dahua
    1600, (05):
  • [23] Seismic performance and retrofit of steel pile to concrete cap connections
    Shama, AA
    Mander, JB
    Aref, AJ
    ACI STRUCTURAL JOURNAL, 2002, 99 (01) : 51 - 61
  • [24] Prestressed Pile to Bent Cap Connections: Seismic Performance of a Full-Scale Three-Pile Specimen
    Larosche, Aaron
    Cukrov, Mark
    Sanders, David
    Ziehl, Paul
    JOURNAL OF BRIDGE ENGINEERING, 2014, 19 (03)
  • [25] Effect of the pile cap length and the soil relative density on the pile cap - pile - dense soil interaction: Experimental investigation
    Basha, Ali
    Elmorsy, Sabry
    Mansour, Walid
    Ramadan, Basant
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2024, 20
  • [26] Lateral resistance of pile cap - an experimental investigation
    Nath, U. K.
    Hazarika, P. J.
    INTERNATIONAL JOURNAL OF GEOTECHNICAL ENGINEERING, 2013, 7 (03) : 266 - 272
  • [27] Pile load test of jacked open-ended prestressed high-strength concrete pipe pile in clay
    Kou, Hailei
    Chu, Jian
    Guo, Wei
    Zhang, Mingyi
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2018, 171 (03) : 243 - 251
  • [28] STUDY ON THE IMPROVEMENT IN BEARING CAPACITY AND DEFORMABILITY OF PRESTRESSED HIGH STRENGTH CONCRETE PILE.
    Kokusho, Seiji
    Wada, Akira
    Kobayashi, Katsumi
    Mitsugi, Shiro
    1600,
  • [29] Experimental study on the seismic performance of the prestressed high-strength concrete pipe pile reinforced with non-prestressed steel bars
    Liu, Chang
    Sun, Yanan
    Zheng, Gang
    Liu, Yongchao
    Hu, Qiubin
    Liu, Yanpo
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2018, 51 (04): : 77 - 86
  • [30] Punching Shear Strength of CFT Bridge Column to Reinforced Concrete Four-Pile Cap Connections
    Li, Xian
    Wu, Yun-Peng
    Li, Xin-Zhang
    Xia, Jun
    Lv, Heng-Lin
    JOURNAL OF BRIDGE ENGINEERING, 2017, 22 (08)