共 27 条
- [23] A comparative life cycle assessment of three high-performance glazing systems for office buildings in a hot desert climate zone Clean Technologies and Environmental Policy, 2020, 22 : 1499 - 1515
- [27] Performance standards and acceptable test conditions for preventive termiticide and insecticide treatments, termite baiting systems, and physical barriers for new structures or buildings under construction (pre-construction; during construction; post-construction) FLORIDA ENTOMOLOGIST, 2021, 104 (03) : 195 - 204