Hybrid Heuristic Shifting Bottleneck Procedure for Parallel-Machine Job-Shop Scheduling Using GPU

被引:1
|
作者
Vilasagarapu, Sundeep [1 ]
Guddeti, Ram Mohana Reddy [1 ]
机构
[1] Natl Inst Technol Karnataka, Dept Informat Technol, Mangalore, India
关键词
Job Shop Scheduling; Heuristic; Shifting Bottleneck Procedure; Meta-heuristics; Parallel-Machine; GPU; TABU SEARCH; ALGORITHM;
D O I
10.1109/CSNT.2015.36
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, we implement the Parallel-Machine Job Shop Scheduling Problem (JSSP) using the modified shifting bottleneck procedure along with the heuristic Tabu search algorithm. JSSP has several real-time applications such as product manufacturing units, real-world train scheduling problem etc., Since JSSP is an NP hard problem, an optimal solution may not exist hence with the help of heuristic algorithm we try to find the approximate solution. Experimental results demonstrate that the modified shifting bottleneck procedure (SBP) shows better results than the existing SBP. And also with the help of meta-heuristic algorithm, the JSSP for larger instances can be solved easily. Results also demonstrate that GPU based Tabu search is on an average 1.8 times faster than CPU based Tabu search.
引用
收藏
页码:1318 / 1322
页数:5
相关论文
共 50 条
  • [41] Guided local search with shifting bottleneck for job shop scheduling
    Balas, E
    Vazacopoulos, A
    MANAGEMENT SCIENCE, 1998, 44 (02) : 262 - 275
  • [42] Heuristic solving a bicriteria parallel-machine scheduling problem
    Fiala, P
    KYBERNETIKA, 1997, 33 (06) : 687 - 694
  • [43] A parallel hybrid ant colony optimisation approach for job-shop scheduling problem
    Zhang, Haipeng
    Gen, Mitsuo
    International Journal of Manufacturing Technology and Management, 2009, 16 (1-2) : 22 - 41
  • [44] AN ITERATIVE PROCEDURE FOR LOT STREAMING IN JOB-SHOP SCHEDULING
    DAUZEREPERES, S
    LASSERRE, JB
    COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) : 231 - 234
  • [45] A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    Pinedo, M
    Singer, M
    NAVAL RESEARCH LOGISTICS, 1999, 46 (01) : 1 - 17
  • [46] Robust Intelligent Construction Procedure for Job-Shop Scheduling
    Abdolrazzagh-Nezhad, Majid
    Abdullah, Salwani
    INFORMATION TECHNOLOGY AND CONTROL, 2014, 43 (03): : 217 - 229
  • [47] A heuristic algorithm for the distributed and flexible job-shop scheduling problem
    Mohsen Ziaee
    The Journal of Supercomputing, 2014, 67 : 69 - 83
  • [48] A heuristic combination method for solving job-shop scheduling problems
    Hart, E
    Ross, P
    PARALLEL PROBLEM SOLVING FROM NATURE - PPSN V, 1998, 1498 : 845 - 854
  • [49] A Heuristic Method for Job-Shop Scheduling with an Infinite Wait Buffer
    Zhao, Z. J.
    Kim, J.
    Luo, M.
    Lau, H. C.
    Ge, S. S.
    Zhang, J. B.
    2008 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2008, : 1046 - +
  • [50] A heuristic algorithm for the distributed and flexible job-shop scheduling problem
    Ziaee, Mohsen
    JOURNAL OF SUPERCOMPUTING, 2014, 67 (01): : 69 - 83