Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators

被引:48
|
作者
Haponava, Tatsiana [1 ]
Al-Jibouri, Saad [2 ]
机构
[1] NEN Dutch Standardizat Inst, NL-2623 AX Delft, Netherlands
[2] Univ Twente, Dept Civil Engn, NL-7500 AE Enschede, Netherlands
关键词
Measurement system; Process performance; Performance indicators; CONSTRUCTION; BENCHMARKING;
D O I
10.1061/(ASCE)ME.1943-5479.0000078
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Despite some evidence of its usefulness, performance measurement by using Key Performance Indicators (KPIs) in the construction industry also has its critics. Among the shortcomings attributed to existing KPIs is the fact that almost all of them are product oriented. This means that the indicators are mostly used for review purposes after a project is completed and do not provide the opportunity to control the work whilst the project is still in progress. Many researchers have agreed on the need for a new approach that considers the construction process and allows active control. This paper describes the design of a proposed generic system for measuring process performance. As a basis for measuring process performance, the proposed measurement system relies on a series of questions related to both process completeness and process quality. The structure of the measurement system is on the basis of the findings of an earlier stage of the research that had resulted in the development of a number of process-based KPIs and the key issues they encompass. The appropriateness of the proposed measurement system has been tested on two on-going projects. The testing has shown that the proposed system produces relatively accurate indications of actual performance of construction projects. In this research, it was not possible to test the validity or the effectiveness of the proposed measurement system for control in practice. This is because of the long timescales involved in real-life projects and because of the possible influence of control actions taken by project management between the various processes. DOI: 10.1061/(ASCE)ME.1943-5479.0000078. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:140 / 149
页数:10
相关论文
共 50 条
  • [21] Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction
    Lin, Gongbo
    Shen, Geoffrey Qiping
    Sun, Ming
    Kelly, John
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (09): : 698 - 706
  • [22] Quality Initiatives Key Performance Indicators for Measuring and Improving Radiology Department Performance
    Abujudeh, Hani H.
    Kaewlai, Rathachai
    Asfaw, Benjamin A.
    Thrall, James H.
    [J]. RADIOGRAPHICS, 2010, 30 (03) : 571 - 580
  • [23] Performance measurement system design: developing and testing a process-based approach
    Neely, A
    Mills, J
    Platts, K
    Richards, H
    Gregory, M
    Bourne, M
    Kennerley, M
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2000, 20 (9-10) : 1119 - 1145
  • [24] Identifying key performance indicators for use in control of pre-project stage process in construction
    Haponava, Tatsiana
    Al-Jibouri, Saad
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2009, 58 (02) : 160 - 173
  • [25] The Management of Sustainability of Innovative Development Using a System of Key Performance Indicators
    Potekhina, Elena, V
    Antonova, Ludmila, I
    Guschina, Olga M.
    [J]. INDUSTRY COMPETITIVENESS: DIGITALIZATION, MANAGEMENT, AND INTEGRATION, VOL 1, 2020, 115 : 387 - 394
  • [26] Project Performance Indicators of Engineering Design Groups: Evaluation and Proposed Improvement
    Hartono, B.
    Muhamad, I.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY (ICMIT 2014), 2014, : 140 - 144
  • [27] Systematic key performance indicators for measuring modular integrated construction
    Zhang, Zhiqian
    Xie, Mingcheng
    Pan, Wei
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING SUSTAINABILITY, 2022, 175 (03) : 113 - 128
  • [28] UTILIZING KEY PERFORMANCE INDICATORS IN MEASURING EFFICIENCY AMONG TELEWORKERS
    Lopez, Gaylord P.
    Wright, Natika
    Geller, Robert J.
    Hon, Stephanie L.
    [J]. CLINICAL TOXICOLOGY, 2011, 49 (06) : 595 - 595
  • [29] Process-based performance measurement in a virtual organisation
    Grudzewski, Wieslaw M.
    Sankowska, Anna
    Wanátuchowicz, Monika
    Babuška, Lukasz
    [J]. International Journal of Networking and Virtual Organisations, 2007, 4 (03) : 217 - 228
  • [30] Limitations of Performance Measurement Systems based on Key Performance Indicators
    Pidun, Tim
    Felden, Carsten
    [J]. AMCIS 2011 PROCEEDINGS, 2011,