APPLICATION OF COST SIGNIFICANT ITEMS TOWARDS IMPROVING ESTIMATION FOR LIFE CYCLE COSTING OF BUILDING PROJECTS

被引:0
|
作者
Alqahtani, Ayedh [1 ]
Whyte, Andrew [1 ]
机构
[1] Curtin Univ, Dept Civil Engn, Perth, WA, Australia
关键词
Pareto's principle; Construction costs; Design and construction stage; Operation and maintenance stage; Asset management;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects have numerous variable factors affecting the value of life cycle-cost (LCC) and there is interaction between these factors, leading to complicated process. Therefore the current LCC models suffer from the absence of a standardized and a simple methodology of both the collection data and estimation LCC. Identification of the significant cost factors affecting the output of LCC is important step before embarking upon the collection of progress information. Furthermore, components of construction differ in their cost and time-importance, and thus management effort must be equivalently distributed. The concept of cost significant items (CSIs) is the best method to simplify estimation methodology as well as the collection data of construction projects. In general, The CSIs concept aims to determine the small number of items which represent a constant percentage of the LCC of construction projects. Therefore, this paper aims to present the explanation of each stage of LCC, the current classifications of asset components, the CSIs concept and previous practice of the significant cost items on the construction sector.
引用
收藏
页码:A71 / A76
页数:6
相关论文
共 50 条
  • [41] Integrating life cycle costing and life cycle assessment using extended material flow cost accounting
    Bierer, Annett
    Goetze, Uwe
    Meynerts, Lilly
    Sygulla, Ronny
    JOURNAL OF CLEANER PRODUCTION, 2015, 108 : 1289 - 1301
  • [42] A building cost estimation model based on cost significant work packages
    Tas, Elcin
    Yaman, Hakan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2005, 12 (03) : 251 - +
  • [43] Cost Estimation of Product Life Cycle
    Mai, Ziqin
    Xu, Tingting
    Sun, Li
    Wang, Xiulun
    Fan, Jianmin
    Sun, Aiqiao
    ADVANCED DESIGN TECHNOLOGY, 2012, 421 : 582 - 585
  • [44] Machining Equipment Life Cycle Costing Model with Dynamic Maintenance Cost
    Bengtsson, Marcus
    Kurdve, Martin
    23RD CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2016, 48 : 102 - 107
  • [45] Towards the optimum cost of ownership of switched-mode power supplies: Early stage cost management with life-cycle costing
    Bescherer, Frank
    Sippola, Mika
    IECON 2006 - 32ND ANNUAL CONFERENCE ON IEEE INDUSTRIAL ELECTRONICS, VOLS 1-11, 2006, : 759 - +
  • [46] Life-Cycle Cost tenders for infrastructure projects
    Bakker, Jaap
    Volwerk, Joris
    LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 103 - 110
  • [47] Building equipment life cycle cost studies
    Zhang, Zhao
    ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 3702 - 3705
  • [48] Research on the Life Cycle Cost of Construction and Building
    Ma, Mengna
    Li, Jianfeng
    Wan, Chen
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 917 - 920
  • [49] Life Cycle Cost Evaluation of Green Building
    Wang, Xiaoyan
    Zhang, Rui
    PROCEEDINGS OF THE 2010 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND SCIENTIFIC MANAGEMENT, VOLS 1-2, 2010, : 681 - 684
  • [50] The Influence of Green Building Application on High-Rise Building Life Cycle Cost and Valuation in Indonesia
    Utomo, Christiono
    Astarini, Sulfiah Dwi
    Rahmawati, Fitri
    Setijanti, Purwanita
    Nurcahyo, Cahyono Bintang
    BUILDINGS, 2022, 12 (12)