RETRACTED: Artificial Intelligence Technology Based on Deep Learning in Building Construction Management System Modeling (Retracted Article)

被引:8
|
作者
Wang, Hongbo [1 ]
Hu, Yan [2 ]
机构
[1] Guangdong Engn Polytech, Guangzhou 510520, Peoples R China
[2] Guangzhou Metro Design & Res Inst Co Ltd, Guangzhou 510010, Peoples R China
关键词
INFORMATION;
D O I
10.1155/2022/5602842
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In order to explore the application of AI technology in construction management system modeling, the author proposed the application of a deep learning-based AI technology in construction management system modeling. The 3 D reconstruction deep learning model is first introduced, and then the model idea of the construction progress reliability control system is designed based on BIM (building information model). Second, the construction process of the 4dbim model is described, and the construction method is introduced. The construction of the model provides data information for the construction schedule reliability control system. Finally, the three functional modules of progress monitoring, progress reliability early warning, and progress prediction are realized by combining the S-curve comparison method, and the work of the system is described through case simulation. The early warning result is from June 7 to June 11, the progress deviation is between (-2%, 2%), and the progress is basically controlled. On June 13, the planned workload was 81.099%, and the actual cumulative workload was 7.099%, which was 4% less than the planned workload. The project progress was out of date, so it needs to be closely tracked. On June 15, the planned workload was 85.511%, and the actual cumulative workload was 80.899%, 4.5% less than the planned workload. The forecast result is the line forecast of the actual cumulative completion percentage on June 17. After calculation, the forecast result on June 17 is 84.311%. The progress deviation on June 17 was 5.21%. If no timely delay is taken on June 15, the delay will get worse. In addition, the system can predict the completion period of the project. When the actual percentage of cumulative completion is greater than or equal to 100%, it indicates that the project has been completed. Therefore, we can calculate the completion period of the three-storey project, and the construction period is about June 29 or 30. When the simulation can be carried out, the simulation number is set as 1000 times, the completion probability of the project is only 40%, and the completion probability is not too high. Artificial intelligence technology can realize progress monitoring, progress reliability early warning, and progress prediction. This system model prepares for software development and is conducive to improving the progress reliability control level of construction enterprises. Starting from the schedule planning subsystem and the schedule control subsystem, this paper studies the application of the artificial intelligence technology based on deep learning in the modeling of a building construction management system. The results show that this technology can effectively improve the efficiency of the building construction schedule management. Compared with the existing management methods, it shows great advantages in terms of operating costs and ease of use. It also promotes the application of artificial intelligence technology in the construction phase.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] RETRACTED: Design of Human Resource Management System Based on Deep Learning (Retracted Article)
    Li, Jinlong
    Zhou, Zhe
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [22] RETRACTED: University Education Management Model Based on Artificial Intelligence Programming and Analysis Technology Foundation for Building Models and Applications (Retracted Article)
    Huang, Ming
    MOBILE INFORMATION SYSTEMS, 2022, 2022
  • [23] RETRACTED: Analysis of University Education Management Based on Artificial Intelligence (Retracted Article)
    Zhu, Hongmei
    SECURITY AND COMMUNICATION NETWORKS, 2022, 2022
  • [24] RETRACTED: Optimization of Distribution Automation System Based on Artificial Intelligence Wireless Network Technology (Retracted Article)
    Tian, Weihua
    Meng, Xiangbin
    Wang, Jianing
    Yan, Hongkui
    JOURNAL OF SENSORS, 2022, 2022
  • [25] RETRACTED: Design and Implementation of Intelligent Teaching System Based on Artificial Intelligence and Computer Technology (Retracted Article)
    Xu, Shuai
    Wang, Ting
    Dai, Jiahai
    Wu, DanLin
    SECURITY AND COMMUNICATION NETWORKS, 2022, 2022
  • [26] RETRACTED: Maintenance and Management Technology of Medical Imaging Equipment Based on Deep Learning (Retracted Article)
    Liu, Bin
    Tong, Lingli
    Liu, Yanmei
    Guo, Zhizhang
    CONTRAST MEDIA & MOLECULAR IMAGING, 2022, 2022
  • [27] RETRACTED: Artificial intelligence in the management of acute leukemia (Retracted Article)
    Kubasch, Anne Sophie
    Grieb, Nora
    Oeser, Alexander
    Haferlach, Claudia
    Platzbecker, Uwe
    ONKOLOGIE, 2022, 28 (08): : 731 - 732
  • [28] RETRACTED: Design and implementation of marine information management network security system based on artificial intelligence embedded technology (Retracted Article)
    Zhang, Kun
    Zhou, Yu
    Long, Haixia
    Wu, Shulei
    Wang, Chaoyang
    Hong, Haizhuang
    Fu, Xixi
    Wang, Haifeng
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2024, 46 (02) : 4817 - 4827
  • [29] RETRACTED: The Laboratory Intelligent Management System Using NB-IoT and Artificial Intelligence Technology (Retracted Article)
    Zhang, Fang
    Wu, Jie
    Wu, Faquan
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [30] RETRACTED: Design of Intelligent Nursing System Based on Artificial Intelligence (Retracted Article)
    Wu, Suzhen
    JOURNAL OF SENSORS, 2022, 2022