An interval-based possibilistic programming method for waste management with cost minimization and environmental-impact abatement under uncertainty

被引:32
|
作者
Li, Y. P. [1 ]
Huang, G. H. [1 ]
机构
[1] N China Elect Power Univ, Res Acad Energy & Environm Studies, Beijing 102206, Peoples R China
关键词
Decision; Environmental impact; Fuzzy programming; Interval analysis; Optimization; Pollution control; Solid waste; Uncertainty; MODEL DEVELOPMENT; SYSTEMS; EMISSIONS; DESIGN;
D O I
10.1016/j.scitotenv.2010.05.038
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Considerable public concerns have been raised in the past decades since a large amount of pollutant emissions from municipal solid waste (MSW) disposal of processes pose risks on surrounding environment and human health. Moreover, in MSW management, various uncertainties exist in the related costs, impact factors and objectives, which can affect the optimization processes and the decision schemes generated. In this study, an interval-based possibilistic programming (IBPP) method is developed for planning the MSW management with minimized system cost and environmental impact under uncertainty. The developed method can deal with uncertainties expressed as interval values and fuzzy sets in the left- and right-hand sides of constraints and objective function. An interactive algorithm is provided for solving the IBPP problem, which does not lead to more complicated intermediate submodels and has a relatively low computational requirement. The developed model is applied to a case study of planning a MSW management system, where mixed integer linear programming (MILP) technique is introduced into the IBPP framework to facilitate dynamic analysis for decisions of timing, sizing and siting in terms of capacity expansion for waste-management facilities. Three cases based on different waste-management policies are examined. The results obtained indicate that inclusion of environmental impacts in the optimization model can change the traditional waste-allocation pattern merely based on the economic-oriented planning approach. The results obtained can help identify desired alternatives for managing MSW, which has advantages in providing compromised schemes under an integrated consideration of economic efficiency and environmental impact under uncertainty. (c) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:4296 / 4308
页数:13
相关论文
共 50 条
  • [1] Modeling for waste management associated with environmental-impact abatement under uncertainty
    Li, P.
    Li, Y. P.
    Huang, G. H.
    Zhang, J. L.
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2015, 22 (07) : 5003 - 5019
  • [2] Modeling for waste management associated with environmental-impact abatement under uncertainty
    P. Li
    Y. P. Li
    G. H. Huang
    J. L. Zhang
    [J]. Environmental Science and Pollution Research, 2015, 22 : 5003 - 5019
  • [3] Interval-fuzzy possibilistic mixed integer linear programming for environmental management under uncertainty
    Li, Y. P.
    Huang, G. H.
    Guo, P.
    Nie, S. L.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENT AND POLLUTION, 2010, 42 (1-3) : 107 - 124
  • [4] Interval-Based Air Quality Index Optimization Model for Regional Environmental Management Under Uncertainty
    Lv, Ying
    Huang, Guohe
    Li, Yongping
    Yang, Zhifeng
    Li, Chunhui
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2009, 26 (11) : 1585 - 1597
  • [5] Risk management of energy system for identifying optimal power mix with financial-cost minimization and environmental-impact mitigation under uncertainty
    Nie, S.
    Li, Y. P.
    Liu, J.
    Huang, Charley Z.
    [J]. ENERGY ECONOMICS, 2017, 61 : 313 - 329
  • [6] An interval-based regret-analysis method for identifying long-term municipal solid waste management policy under uncertainty
    Cui, L.
    Chen, L. R.
    Li, Y. P.
    Huang, G. H.
    Li, W.
    Xie, Y. L.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2011, 92 (06) : 1484 - 1494
  • [7] Robust interval quadratic programming and its application to waste management under uncertainty
    Yongping Li
    Guohe Huang
    [J]. Environmental Systems Research, 1 (1):
  • [8] An interval-valued fuzzy linear programming with infinite α-cuts method for environmental management under uncertainty
    S. Wang
    G. H. Huang
    H. W. Lu
    Y. P. Li
    [J]. Stochastic Environmental Research and Risk Assessment, 2011, 25 : 211 - 222
  • [9] An interval-valued fuzzy linear programming with infinite α-cuts method for environmental management under uncertainty
    Wang, S.
    Huang, G. H.
    Lu, H. W.
    Li, Y. P.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2011, 25 (02) : 211 - 222
  • [10] Optimization of electric power systems with cost minimization and environmental-impact mitigation under multiple uncertainties
    Nie, S.
    Huang, Z. C.
    Huang, G. H.
    Yu, L.
    Liu, J.
    [J]. APPLIED ENERGY, 2018, 221 : 249 - 267