Analysis and prediction of TBM disc cutter wear when tunneling in hard rock strata: A case study of a metro tunnel excavation in Shenzhen, China

被引:60
|
作者
Su, Weilin [1 ,2 ]
Li, Xinggao [1 ,2 ]
Jin, Dalong [1 ,2 ]
Yang, Yi [1 ,2 ]
Qin, Ruicheng [1 ,2 ]
Wang, Xuyang [1 ,2 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Urban Underground Engn, Minist Educ, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
基金
中国国家自然科学基金;
关键词
Tunnel boring machine (TBM); Disc cutter wear; Geological indices; Tunneling parameter; Plastic removal abrasiveness; Prediction model; CERCHAR ABRASIVITY INDEX; BORING MACHINE; WATER;
D O I
10.1016/j.wear.2020.203190
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Disc cutter wear is the result of dynamic contact and friction between the tools and rocks in tunnel boring machine (TBM) tunneling. It can lead to a reduction in excavation efficiency, disruption of construction schedules, and extra costs. The geological indices, such as uniaxial compressive strength (UCS), Brazilian tensile strength (BTS) and Cerchar abrasion index (CAI), and the tunneling parameters, such as advance rate and rotation speed, were collected in the Shenzhen metro tunnel excavation project, and they have major effects on the cutter consumption rate. The wear data of 871 disc cutters over a 1592 m-long advance distance were analyzed. It was found that 87% of the disc cutters used were replaced due to normal wear, and the others were replaced due to abnormal wear. Flat wear mainly occurs for the disc cutters in the central area of the cutterhead, because they have a larger rotational resistance and eccentric loading due to their smaller rotational radius. The abnormal wear of the outer-area disc cutters mainly consists of forms of cutter ring cracking and bearing crushing owing to a higher rotation speed. A disc cutter wear prediction model was established to estimate the disc cutter consumption based on the plastic removal abrasiveness and motion analysis of the cutter rings. A rough linear correlation between the cumulative wear depth and the advance distance is found, and the wear rate varies during the tunneling progress due to the different geotechnical or construction parameters. The predicted wear is generally less than the actual wear, and the maximum prediction error is 49.4 mm. The predicted error is always larger for the disc cutters that have a high probability of non-uniform wear, especially for those in the outer area.
引用
收藏
页数:11
相关论文
共 37 条
  • [21] Analysis of the Disc Cutter Cutting Load and Performance during TBM Tunneling in Soft-Hard Varied Strata through Laboratory Cutting Test
    Su, Weilin
    Niu, Fumin
    Yang, Fengwei
    Yang, Yi
    [J]. GEOTECHNICAL TESTING JOURNAL, 2023, 46 (05): : 712 - 730
  • [22] Quantitative estimation of TBM disc cutter wear from in-situ parameters by optimization algorithm improved back-propagation neural network: A case study of a metro tunnel in Guangzhou, China
    Ding, X.
    Xie, A. Y.
    Xue, H.
    [J]. PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2627 - 2634
  • [23] Full-scale test of disc cutter rotary cutting in TBM tunnelling: a case study of Mawan granite in Shenzhen, China
    Deng, Long-Chuan
    Li, Xiao-Zhao
    Xu, Wentao
    Zhang, Chi
    Zhuang, Qian-Wei
    Li, Fu-Qing
    Zhou, Qiang
    [J]. Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2024, 10 (01)
  • [24] Disc Cutter's Rock Breaking Ability and Wear Resistance in Extremely Hard Rock: A Case Study in Qinling Tunnel of Han River to Wei River Water Diversion Project
    Sun, Zhenchuan
    Yang, Yandong
    Chen, Kui
    Li, Fengyuan
    Zhou, Jianjun
    Zhang, Bing
    Chen, Qiao
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (06) : 4901 - 4910
  • [25] Disc Cutter’s Rock Breaking Ability and Wear Resistance in Extremely Hard Rock: A Case Study in Qinling Tunnel of Han River to Wei River Water Diversion Project
    Zhenchuan Sun
    Yandong Yang
    Kui Chen
    Fengyuan Li
    Jianjun Zhou
    Bing Zhang
    Qiao Chen
    [J]. Geotechnical and Geological Engineering, 2019, 37 : 4901 - 4910
  • [26] Comprehensive ahead prospecting for hard rock TBM tunneling in complex limestone geology: A case study in Jilin, China
    Liu, Bin
    Guo, Qian
    Liu, Zhengyu
    Wang, Chuanwu
    Nie, Lichao
    Xu, Xinji
    Chen, Lei
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 93
  • [27] Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6
    Zhao, Mingji
    Cheng, Yun
    Song, Zhanping
    Wang, Tong
    Zhang, Yuwei
    Gong, Yitong
    Song, Yuncai
    [J]. ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [28] Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
    Morteza Karami
    Shokrollah Zare
    Jamal Rostami
    [J]. Bulletin of Engineering Geology and the Environment, 2021, 80 : 3853 - 3870
  • [29] Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
    Karami, Morteza
    Zare, Shokrollah
    Rostami, Jamal
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (05) : 3853 - 3870
  • [30] Experimental and numerical simulation study on the relationship between cutting depth of high-pressure water jet with high traverse speed and disc cutter penetration of TBM in hard rock tunnel
    Lu, Yiqiang
    Zhang, Sheng
    He, Fei
    Wang, Longfei
    Wang, Anxin
    Wang, Mingyao
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 142