Performance Evaluation of Underground Mining Machinery: A Case Study

被引:1
|
作者
Balaraju, J. [1 ]
Govinda Raj, M. [1 ]
Murthy, Ch. S. N. [1 ]
机构
[1] NITK Surathkal, Min Engn Dept, Mangalore, Karnataka, India
关键词
Production; LHD; Breakdown; Reliability; RBD; Maintenance; JAJARM-BAUXITE MINE; RELIABILITY; MAINTENANCE; EQUIPMENT;
D O I
10.1007/s11668-020-00980-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Unexpected occurrence of uneven breakdowns and their consequences have a significant influence on the equipment life. Hence, there is a need to discover the motives for the happening of critical potential failures and required repair or replacement action to control. Reliability analysis is utilized to approximate the performance of the equipment. In this study, the performance of the underground mining machinery known as load haul dumper (LHD) has been estimated with reliability analysis. The best-fit distribution of the data sets was selected by testing the numerous statistical distributions using the Kolmogorov-Smirnov (K-S) test. The percentage of reliability of each subsystem of the LHD machine was computed based on the best-fit approximation. The overall system reliability of the equipment was estimated using a series configuration-based reliability block diagram (RBD) approach. The reliability-based preventive maintenance (PM) time intervals were also computed for estimated 90.00% reliability. To accomplish the desired level of reliability, a review on maintenance programs should be made. Possible recommendations were made to the maintenance department in the industry for improvement in equipment.
引用
收藏
页码:1726 / 1737
页数:12
相关论文
共 50 条
  • [31] THE APEX MINE - A CASE-STUDY IN SMALL-SCALE UNDERGROUND MINING
    GUILL, RW
    CIM BULLETIN, 1990, 83 (942): : 72 - 74
  • [32] Using a case study fatality to depict the limits of proximity detection systems for articulating, underground machinery
    Godwin, Alison
    Schwabe, Nicholas
    SAFETY SCIENCE, 2016, 87 : 47 - 52
  • [33] An evaluation model for process capability of multiple-process machinery: a case study on the transfer machinery
    Lin, Wen-Tsann
    Wang, Shen-Tsu
    Li, Meng-Hua
    Huang, Jiung-Ming
    Chen, Ken-Suan
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2010, 13 (03): : 445 - 466
  • [34] Performance Evaluation of Underground Mine Communication and Monitoring Devices: Case Studies
    Ranjan, Alok
    Sahu, H. B.
    Misra, Prasant
    INFORMATION SYSTEMS DESIGN AND INTELLIGENT APPLICATIONS, VOL 1, 2015, 339 : 685 - 694
  • [35] Evaluation of spatial performance of metro-led urban underground public space: A case study in Shanghai
    Ma, Chen-Xiao
    Peng, Fang-Le
    Qiao, Yong-Kang
    Li, Hu
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 124
  • [36] Integrated Positioning for Coal Mining Machinery in Enclosed Underground Mine Based on SINS/WSN
    Fan, Qigao
    Li, Wei
    Hui, Jing
    Wu, Lei
    Yu, Zhenzhong
    Yan, Wenxu
    Zhou, Lijuan
    SCIENTIFIC WORLD JOURNAL, 2014,
  • [37] Effect of Mining Machinery on MIMO-UWB Radiowave Propagation Within an Underground Gallery
    Ben Mabrouk, Ismail
    Talbi, Larbi
    Nedil, Mourad
    Hettak, Khelifa
    IEEE TRANSACTIONS ON ANTENNAS AND PROPAGATION, 2012, 60 (11) : 5390 - 5399
  • [38] MINING MACHINERY
    BREWER, AF
    INDUSTRIAL LUBRICATION AND TRIBOLOGY, 1971, 23 (12) : 425 - &
  • [39] Technical and economic evaluation of fluorescent and LED luminaires in underground mining. A case study: New mine level of El Teniente
    Chueco, Francisco
    Lopez, Fernando
    Bobadilla, Miguel
    ENERGY AND BUILDINGS, 2015, 93 : 16 - 22
  • [40] A Study of Performance Evaluation of HRM: Based on Data Mining
    Zhao Xin
    2008 INTERNATIONAL SEMINAR ON FUTURE INFORMATION TECHNOLOGY AND MANAGEMENT ENGINEERING, PROCEEDINGS, 2008, : 45 - 48