U-shaped production lines are a common component of Just-In-Time systems. When several U-lines operate in close proximity, an opportunity exists to balance two or more U-lines together and reduce the total number of stations required to operate the facility. The concept of a JIT production unit, where a number of U-lines produce and assemble parts for the same product line, is introduced. The problem of balancing a JIT Production Unit is considered as the N U-line balancing problem considering travel. This problem is modelled and heuristic solution algorithms are presented for both the general case, where U-line locations are not fixed, and for the fixed location case. A subproblem, the problem of assigning tasks to stations which may include tasks from more than one U-line, provides new challenges for operations managers. This new problem is the multi-line station assignment problem. The benefits of multiple U-line balancing are examined in an empirical study.
引用
收藏
页码:215 / 237
页数:23
相关论文
共 50 条
  • [41] AN ALGORITHM FOR THE LINE BALANCING PROBLEM
    GUTJAHR, AL
    NEMHAUSER, GL
    MANAGEMENT SCIENCE, 1964, 11 (02) : 308 - 315
  • [42] U-shaped assembly line balancing problem with genetic algorithm
    Hwang, Rea Kook
    Katayama, Hiroshi
    Gen, Mitsuo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (16) : 4637 - 4649
  • [43] THE KANBAN ASSIGNMENT PROBLEM IN SERIAL JUST-IN-TIME PRODUCTION SYSTEMS
    CO, HC
    JACOBSON, SH
    IIE TRANSACTIONS, 1994, 26 (02) : 76 - 85
  • [44] PLANNING FOR JUST-IN-TIME PRODUCTION
    CHAHARBAGHI, K
    DAVIES, BL
    MINETT, SC
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1989, 2 (05) : 268 - 274
  • [45] Optimizing U-Shaped Production Line Balancing Problem with Exchangeable Task Locations and Walking Times
    Kuo, Yiyo
    Yang, Taho
    Huang, Tzu-Lin
    APPLIED SCIENCES-BASEL, 2022, 12 (07):
  • [46] The assembly line balancing problem as an N-person game
    Kaluski, J
    INTELLIGENT ASSEMBLY AND DISASSEMBLY (IAD'98), 1998, : 41 - 46
  • [47] JUST-IN-TIME BALANCING OF FEEDBACK ASSEMBLY LINES VIA CONSTRAINED-LINEAR TROPICAL MODEL
    Guimaraes, Luiza Sernizon
    Maia, Carlos Andrey
    IFAC PAPERSONLINE, 2020, 53 (04): : 62 - 67
  • [48] THE JUST-IN-TIME PRODUCTION CHALLENGE
    MUSSELWHITE, WC
    TRAINING AND DEVELOPMENT JOURNAL, 1987, 41 (02): : 27 - 29
  • [49] Procedures for the Time and Space constrained Assembly Line Balancing Problem
    Bautista, Joaquin
    Pereira, Jordi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (03) : 473 - 481
  • [50] Estimation of time and cost oriented assembly line balancing problem
    Grzechca, Waldemar
    ICSENG 2008: INTERNATIONAL CONFERENCE ON SYSTEMS ENGINEERING, 2008, : 248 - 253