Amoco is using reliability centered maintenance to improve gas processing plant rotating equipment operations

被引:0
|
作者
Reddick, SL
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Reliability centered maintenance (RCM) is a process that can be used to define the maintenance requirements for any piece of plant equipment while considering the operating practices and conditions. This process has mainly been used on the rotating equipment in Amoco's gas processing plants. The reliability centered maintenance process has been used to assure that proper preventive and predictive maintenance procedures are used to minimize more expensive corrective maintenance. In the reliability reviews, teams of operators, mechanics, engineers, and original equipment manufacturer's personnel determine what the plant operators and maintenance personnel need to do to maximize the rotating equipment availability, minimize the maintenance costs, and maintain the mechanical integrity of the equipment. These reviews have also allowed the plants to minimize the spare parts kept for pumps and compressors through structured review of subassemblies at the appropriate detail level. The RCM process and applications to rotating equipment are discussed in this paper.
引用
收藏
页码:174 / 175
页数:2
相关论文
共 50 条
  • [21] Safety-related equipment prioritization for reliability centered maintenance purposes based on a plant specific level 1 PSA
    Universidad Politecnica de Valencia, Valencia, Spain
    Reliab Eng Syst Saf, 1 (35-44):
  • [22] Safety-related equipment prioritization for reliability centered maintenance purposes based on a plant specific level 1 PSA
    Martorell, S
    Serradell, V
    Verdu, G
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 1996, 52 (01) : 35 - 44
  • [23] Reliability-centered maintenance model to managing power distribution system equipment
    Moon, Jong-Fil
    Yoon, Yong Tae
    Lee, Sang-Seung
    Kim, Jae-Chul
    Lee, Hee-Tae
    Park, Geun-Pyo
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 1002 - +
  • [24] Evaluating a reliability centered maintenance program for substation equipment at new century energies
    Wilmeth, RG
    Usrey, MW
    TECHNICAL MANAGEMENT: KEY TO ENTERPRISE SUCCESS IN THE 21ST CENTURY, 2000, : 391 - 400
  • [25] Improve rotating equipment performance with gas-barrier seals
    Adams, WV
    CHEMICAL ENGINEERING PROGRESS, 1996, 92 (10) : 58 - 63
  • [26] RISK AND RELIABILITY CENTERED MAINTENANCE FOR MARITIME OPERATIONS IN THE ARCTIC - EXPERIENCE FROM FISHING
    McGuinness, Edgar
    Dypvik, Tora Gjermstad
    Utne, Ingrid Bouwer
    Holmen, Ingunn Marie
    PROCEEDINGS OF THE ASME 32ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING - 2013 - VOL 6, 2013,
  • [27] Condition based inspection and maintenance of rotating equipment by use of offline/online control equipment and error diagnosis in the gas desulphurization plant grossenkneten
    Online Maschinenueberwachung und Fehlerdiagnose von Rotating Equipment in der Erdgasaufbereitungsanlage Grossenkneten
    Brod, R., 2000, Urban Verlag Hamburg/Wien GmbH, Hamburg, Germany (116):
  • [28] Reliability centered maintenance using System Dynamics Approach
    Khorshidi, Hadi A.
    Gunawan, Indra
    Ibrahim, M. Yousef
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT), 2015, : 1932 - 1936
  • [29] RELIABILITY-CENTERED MAINTENANCE TRIMS NUCLEAR-PLANT COSTS
    KUEHN, SE
    POWER ENGINEERING, 1992, 96 (08) : 23 - 28
  • [30] CONTACT MAINTENANCE OF RADIOACTIVE EQUIPMENT AT IDAHO CHEMICAL PROCESSING PLANT
    AYERS, AL
    MURRAY, CL
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1966, 9 (02): : 621 - +