Crane Lifting Optimization and Construction Monitoring in Steel Bridge Construction Project Based on BIM and UAV

被引:21
|
作者
Tian, Jiahao [1 ]
Luo, Sang [2 ]
Wang, Xinming [3 ]
Hu, Jing [2 ]
Yin, Jun [1 ]
机构
[1] Southeast Univ, Sch Transportat, Nanjing 210096, Peoples R China
[2] Southeast Univ, Intelligent Transportat Res Ctr, Nanjing 210096, Peoples R China
[3] Transportat Bur Suzhou, Suzhou 215007, Peoples R China
关键词
SAFETY; CHECKING; ROBOTS;
D O I
10.1155/2021/5512229
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Modular construction methods are adopted in many spatial and temporal limited projects. As the major equipment used in modular construction, the mobile crane affects the safety and efficiency of construction significantly. Currently, building information modeling (BIM) is widely adopted to improve the lifting operation planning of cranes. However, the inaccurate simulation of the dynamic construction environment makes those BIM-based lifting operation planning methods unsuitable for land mobile cranes operation planning, such as in the overpass bridge construction project, which may cause several safety risks during the lifting process. Based on an overpass steel bridge construction project, this paper attempted to integrate the BIM and unmanned aerial vehicles (UAVs) to streamline lifting operation planning and construction monitoring. Specifically, in the preliminary stage, a level of development (LOD) 400 steel superstructure model was built and then divided into eighty sections. In addition, a three-dimensional (3D) geology model of the as-is construction site was modeled by UAV-captured images. Then, a fusion model which contains the lifting modules models, the as-is site model, and the crane model was gathered, based on which the collision detection was conducted by 4D crane operating path simulation. According to the results, three potential collisions were found and eliminated by lengthening the jib of the crane from 43.5 m to 46.5 m. Furthermore, the optimum crane location for lifting each steel structure was determined based on the 3D geology model. The study shows that the UAV is able to acquire geological information and then 3D simulates the real construction environment quickly and accurately. Furthermore, BIM and UAV have the potential to optimize the design and construction as well as the monitoring of bridge projects.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Construction Project Design Optimization Platform Research Based on BIM
    Zhao, Liang
    Wang, Wenshun
    [J]. 3RD INTERNATIONAL CONFERENCE ON APPLIED ENGINEERING, 2016, 51 : 535 - 540
  • [2] Simulation of bridge steel structure construction process based on BIM technology
    Pan, Wenming
    [J]. Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [3] Application Research on Monitoring Cloud Platform of Bridge Construction Based on BIM
    Zhi Peng
    Shi Tianyun
    Wang Wanqi
    Wang Huilin
    [J]. PROCEEDINGS OF THE 2017 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ICEESD 2017), 2017, 129 : 67 - 72
  • [4] BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule
    Chen, Xinyang
    Zhu, Yifan
    Chen, Hainan
    Ouyang, Yewei
    Luo, Xiaowei
    Wu, Xiaoling
    [J]. AUTOMATION IN CONSTRUCTION, 2021, 130
  • [5] Research on the Construction Monitoring Data Integration of Arch Bridge Based on BIM Technology
    Zhang, Tian
    He, Li
    Sun, Mingyue
    Yang, Gang
    [J]. Journal of Railway Engineering Society, 2021, 38 (05) : 47 - 52
  • [6] TRAVELLING CRANE FOR RAILWAY BRIDGE CONSTRUCTION
    不详
    [J]. BALL BEARING JOURNAL, 1971, (168): : 19 - &
  • [7] Research on collaborative construction management of construction project based on BIM technology
    Zhan C.
    Fu C.
    Wu X.
    [J]. International Journal of Critical Infrastructures, 2023, 19 (01) : 79 - 93
  • [8] CONSTRUCTION SITE MONITORING USING UAV OBLIQUE PHOTOGRAMMETRY AND BIM TECHNOLOGIES
    Qu, Tengteng
    Zang, Wei
    Peng, Zhenwei
    Liu, Jun
    Li, Weiwei
    Zhu, Yun
    Zhang, Bin
    Wang, Yongsheng
    [J]. PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON COMPUTER-AIDED ARCHITECTURAL DESIGN RESEARCH IN ASIA (CAADRIA 2017): PROTOCOLS, FLOWS AND GLITCHES, 2017, : 655 - 662
  • [9] Optimize bridge construction process based on BIM technology
    Shi, X. F.
    Liu, Z. Q.
    Yan, X.
    Ma, Z. Q.
    [J]. MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 250 - 250
  • [10] Safety in Off-Site Construction: Simulation of Crane-Lifting Operations Using VR and BIM
    Shringi, Ankit
    Arashpour, Mehrdad
    Dwyer, Tim
    Prouzeau, Arnaud
    Li, Heng
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2023, 29 (01)