Phase transitions in project scheduling

被引:20
|
作者
Herroelen, W
De Reyck, B
机构
[1] Katholieke Univ Leuven, Dept Appl Econ, B-3000 Leuven, Belgium
[2] Erasmus Univ, NL-3000 DR Rotterdam, Netherlands
关键词
phase transitions; project management; scheduling;
D O I
10.2307/3010563
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Researchers in the area of artificial intelligence have recently shown that many NP-complete problems exhibit phase transitions. Often, problem instances change from being easy to being hard to solve to again being easy to solve when certain of their characteristics are modified. Most often the transitions are sharp, but sometimes they are rather continuous in the order parameters that are characteristic of the system as a whole. To the best of our knowledge, no evidence has been provided so far that similar phase transitions occur in NP-hard scheduling problems. In this paper we report on the existence of phase transitions in various resource-constrained project scheduling problems. We discuss the use of network complexity measures and resource parameters as potential order parameters. We show that while the network complexity measures seem to reveal continuous easy-hard or hard-easy phase transitions, the resource parameters exhibit a relatively sharp easy-hard-easy transition behaviour.
引用
收藏
页码:148 / 156
页数:9
相关论文
共 50 条
  • [1] An Investigation of Phase Transitions in Single-Machine Scheduling Problems
    Wang, Zhihui
    O'Gorman, Bryan
    Tran, Tony T.
    Rieffel, Eleanor G.
    Frank, Jeremy
    Minh Do
    [J]. TWENTY-SEVENTH INTERNATIONAL CONFERENCE ON AUTOMATED PLANNING AND SCHEDULING, 2017, : 325 - 329
  • [2] On project scheduling problem
    A. A. Lazarev
    E. R. Gafarov
    [J]. Automation and Remote Control, 2008, 69 : 2070 - 2087
  • [3] Project management and scheduling
    Massimiliano Caramia
    [J]. Annals of Operations Research, 2020, 285 : 1 - 8
  • [4] Project scheduling - Preface
    Ulusoy, G
    Herroelen, W
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 : 13 - 16
  • [5] On Project Scheduling Problem
    Lazarev, A. A.
    Gafarov, E. R.
    [J]. AUTOMATION AND REMOTE CONTROL, 2008, 69 (12) : 2070 - 2087
  • [6] Project management and scheduling
    Valls, V
    Weglarz, J
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 285 - 288
  • [7] Project management and scheduling
    Oulamara, A.
    Portmann, M. -C.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1133 - 1135
  • [8] PROJECT SCHEDULING TECHNIQUES
    VERANTH, JM
    [J]. CHEMICAL ENGINEERING, 1985, 92 (08) : 61 - 68
  • [9] Project scheduling with calendars
    Franck, B
    Neumann, K
    Schwindt, C
    [J]. OR SPEKTRUM, 2001, 23 (03) : 325 - 334
  • [10] Temporal project scheduling
    不详
    [J]. PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 1 - 19