Project scheduling with calendars

被引:33
|
作者
Franck, B [1 ]
Neumann, K [1 ]
Schwindt, C [1 ]
机构
[1] Univ Karlsruhe, Inst Wirtschaftstheorie & Operat Res, D-76128 Karlsruhe, Germany
关键词
project scheduling-calendars; minimum and maximum time lags; priority-rule methods;
D O I
10.1007/PL00013355
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
For many applications of project scheduling to real-life problems. it is necessary to take into account calendars specifying time intervals during which some resources such as manpower or machines are not available. Whereas the execution of certain activities like packaging may be suspended during breaks, other activities cannot be interrupted due to technical reasons. Minimum and maximum time lags between activities may depend on calendars. too. In this paper, we address the problem of scheduling the activities of a project subject to calendar constraints. We devise efficient algorithms for computing earliest and latest start and completion times of activities. Moreover, we sketch how to use these algorithms for developing priority-rule methods coping with renewable-resource constraints and calendars.
引用
收藏
页码:325 / 334
页数:10
相关论文
共 50 条
  • [1] Project scheduling with calendars
    Birger Franck
    Klaus Neumann
    Christoph Schwindt
    [J]. OR-Spektrum, 2001, 23 : 325 - 334
  • [2] Calendars in project scheduling
    Trautmann, N
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2000, 2001, : 388 - 392
  • [3] Modeling and Solving Project Scheduling with Calendars
    Kreter, Stefan
    Schutt, Andreas
    Stuckey, Peter J.
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2015, 2015, 9255 : 262 - 278
  • [4] Simple irrigation scheduling calendars
    Hill, RW
    Allen, RG
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING-ASCE, 1996, 122 (02): : 107 - 111
  • [5] Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
    Kreter, Stefan
    Rieck, Julia
    Zimmermann, Juergen
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 251 (02) : 387 - 403
  • [6] Imprecise calendars: An approach to scheduling computational grids
    Hollingsworth, JK
    Maneewongvatana, S
    [J]. 19TH IEEE INTERNATIONAL CONFERENCE ON DISTRIBUTED COMPUTING SYSTEMS, PROCEEDINGS, 1999, : 352 - 359
  • [7] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A.A.
    [J]. International Journal of Engineering, Transactions B: Applications, 2022, 35 (08):
  • [8] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A. A.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (08): : 1579 - 1587
  • [9] Global crop calendars of maize and wheat in the framework of the WorldCereal project
    Franch, Belen
    Cintas, Juanma
    Becker-Reshef, Inbal
    Jose Sanchez-Torres, Maria
    Roger, Javier
    Skakun, Sergii
    Antonio Sobrino, Jose
    Van Tricht, Kristof
    Degerickx, Jeroen
    Gilliams, Sven
    Koetz, Benjamin
    Szantoi, Zoltan
    Whitcraft, Alyssa
    [J]. GISCIENCE & REMOTE SENSING, 2022, 59 (01) : 885 - 913
  • [10] CALENDARS - HISTORY OF CALENDARS
    KELEN, J
    [J]. HISTORIA, 1983, (434): : 18 - 23