共 50 条
- [41] Constructive heuristics for the canister filling problem Central European Journal of Operations Research, 2011, 19 : 371 - 389
- [45] Application of Viral Systems for Single-Machine Total Weighted Tardiness Problem 2013 INTERNATIONAL CONFERENCE ON MANUFACTURING, OPTIMIZATION, INDUSTRIAL AND MATERIAL ENGINEERING (MOIME 2013), 2013, 46
- [46] Ant colony optimization for single machine total weighted earliness/tardiness problem PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 301 - 305
- [47] Particle swarm optimization algorithm for single machine total weighted tardiness problem CEC2004: PROCEEDINGS OF THE 2004 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2004, : 1412 - 1419
- [49] A Variable Neighborhood Descent for solving the Single Machine Total Weighted Tardiness Problem 2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,