Solving Multi-Objective Semiconductor Assembly and Test Manufacturing Scheduling Problem Based on Estimation of Distribution Algorithm

被引:0
|
作者
Zhong, Xincheng [1 ,2 ]
Liu, Chang [1 ]
Zhu, Jun [1 ]
Han, Dongbin [3 ]
Yuan, Zhiling [4 ]
机构
[1] Chinese Acad Sci, Shenyang Inst Automat, Key Lab Networked Control Syst, Shenyang, Peoples R China
[2] Univ Chinese Acad Sci, Beijing, Peoples R China
[3] Liaoyang Steel Tube Works Baoji Steel Tube, Liaoyang, Peoples R China
[4] Bohai Shipbldg Heavy Ind Co Ltd, Huludao, Peoples R China
来源
2015 IEEE INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER) | 2015年
关键词
ATM; multi-objective; EDA; sub-module; constrained objective; optimized objective;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In order to solve the problem that, from the current practical perspective of semiconductor assembly and test manufacturing (ATM), the traditional multi-objective optimization algorithm is difficult to realize the practical decision of the enterprise, this paper proposes a new multi-objective estimation of distribution algorithm (EDA) to solve the ATM scheduling problem. According to the demand of the ATM enterprise based on sub-module using two modeling ideas, objectives were divided into two categories: constrained objective and optimized objective, and the different objective had the different searching process. Finally, it used the new algorithm to solve the multi-objective ATM scheduling problem. The result shows that the novel algorithm has the good feasibility and it also has an obvious advantage, the better practicability and maneuverability, compared with the traditional multi-objective optimization methods.
引用
收藏
页码:1496 / 1501
页数:6
相关论文
共 50 条
  • [31] Scheduling of an assembly line with a multi-objective genetic algorithm
    Jianfeng Yu
    Yuehong Yin
    Zhaoneng Chen
    The International Journal of Advanced Manufacturing Technology, 2006, 28 (5-6) : 551 - 555
  • [33] Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm
    Tavakkoli-Moghaddam, R.
    Rahimi-Vahed, A. R.
    Mirzaei, A. H.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (9-10): : 969 - 981
  • [34] Solving the aircraft engine maintenance scheduling problem using a multi-objective evolutionary algorithm
    Kleeman, MP
    Lamont, GB
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, 2005, 3410 : 782 - 796
  • [35] An effective multi-objective evolutionary algorithm for solving the AGV scheduling problem with pickup and delivery
    Zou, Wen-Qiang
    Pan, Quan-Ke
    Wang, Ling
    KNOWLEDGE-BASED SYSTEMS, 2021, 218
  • [36] Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm
    R. Tavakkoli-Moghaddam
    A. R. Rahimi-Vahed
    A. H. Mirzaei
    The International Journal of Advanced Manufacturing Technology, 2008, 36 : 969 - 981
  • [37] Solving a multi-objective manufacturing cell scheduling problem with the consideration of warehouses using a simulated annealing based procedure
    Toncovich, Adrian A.
    Rossit, Daniel A.
    Frutos, Mariano
    Rossit, Diego G.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (01) : 1 - 16
  • [38] Optimization of Contract Distribution Based on Multi-objective Estimation of Distribution Algorithm
    Hu, Laihong
    Yang, Xiaogang
    Fan, Hongdong
    PROCEEDINGS OF 2018 INTERNATIONAL CONFERENCE ON COMPUTING AND ARTIFICIAL INTELLIGENCE (ICCAI 2018), 2018, : 9 - 12
  • [39] The Solving of Multi-Objective Network Designing Problem Based On Genetic Algorithm
    Shi Lianshuan
    Yuan Liang
    Li Zengyan
    Dai Yi
    PROCEEDINGS OF THE FIRST INTERNATIONAL WORKSHOP ON EDUCATION TECHNOLOGY AND COMPUTER SCIENCE, VOL I, 2009, : 446 - +
  • [40] Evolutionary based hybrid GA for solving multi-objective grid scheduling problem
    Ankita
    Sahana, Sudip Kumar
    MICROSYSTEM TECHNOLOGIES-MICRO-AND NANOSYSTEMS-INFORMATION STORAGE AND PROCESSING SYSTEMS, 2020, 26 (05): : 1405 - 1416