Solving Multi-Objective Semiconductor Assembly and Test Manufacturing Scheduling Problem Based on Estimation of Distribution Algorithm

被引:0
|
作者
Zhong, Xincheng [1 ,2 ]
Liu, Chang [1 ]
Zhu, Jun [1 ]
Han, Dongbin [3 ]
Yuan, Zhiling [4 ]
机构
[1] Chinese Acad Sci, Shenyang Inst Automat, Key Lab Networked Control Syst, Shenyang, Peoples R China
[2] Univ Chinese Acad Sci, Beijing, Peoples R China
[3] Liaoyang Steel Tube Works Baoji Steel Tube, Liaoyang, Peoples R China
[4] Bohai Shipbldg Heavy Ind Co Ltd, Huludao, Peoples R China
关键词
ATM; multi-objective; EDA; sub-module; constrained objective; optimized objective;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In order to solve the problem that, from the current practical perspective of semiconductor assembly and test manufacturing (ATM), the traditional multi-objective optimization algorithm is difficult to realize the practical decision of the enterprise, this paper proposes a new multi-objective estimation of distribution algorithm (EDA) to solve the ATM scheduling problem. According to the demand of the ATM enterprise based on sub-module using two modeling ideas, objectives were divided into two categories: constrained objective and optimized objective, and the different objective had the different searching process. Finally, it used the new algorithm to solve the multi-objective ATM scheduling problem. The result shows that the novel algorithm has the good feasibility and it also has an obvious advantage, the better practicability and maneuverability, compared with the traditional multi-objective optimization methods.
引用
收藏
页码:1496 / 1501
页数:6
相关论文
共 50 条
  • [1] A novel multi-objective estimation of distribution algorithm for solving gas lift allocation problem
    Miresmaeili, S. Omid H.
    Pourafshary, Peyman
    Farahani, Farhang Jalali
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2015, 23 : 272 - 280
  • [2] A Hybrid Estimation of Distribution Algorithm for Solving the Multi-objective Multiple Traveling Salesman Problem
    Shim, V. A.
    Tan, K. C.
    Tan, K. K.
    2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
  • [3] Solving system-level synthesis problem by a multi-objective estimation of distribution algorithm
    Wang, Ling
    Fang, Chen
    Suganthan, Ponnuthurai Nagaratnam
    Liu, Min
    EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (05) : 2496 - 2513
  • [4] Multi-objective green flowshop scheduling problem under uncertainty: Estimation of distribution algorithm
    Amiri, M. Faraji
    Behnamian, J.
    JOURNAL OF CLEANER PRODUCTION, 2020, 251
  • [5] An estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem
    Wang, Shengyao
    Wang, Ling
    Liu, Min
    Xu, Ye
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), 2013, : 1 - 8
  • [6] Knowledge-based multi-objective estimation of distribution algorithm for solving reliability constrained cloud workflow scheduling
    Li, Ming
    Pi, Dechang
    Qin, Shuo
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2024, 27 (02): : 1401 - 1419
  • [7] Knowledge-based multi-objective estimation of distribution algorithm for solving reliability constrained cloud workflow scheduling
    Ming Li
    Dechang Pi
    Shuo Qin
    Cluster Computing, 2024, 27 : 1401 - 1419
  • [8] A multi-objective genetic algorithm for solving assembly line balancing problem
    Ponnambalam, SG
    Aravindan, P
    Naidu, GM
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2000, 16 (05): : 341 - 352
  • [9] A Multi-Objective Genetic Algorithm for Solving Assembly Line Balancing Problem
    S. G. Ponnambalam
    P. Aravindan
    G. Mogileeswar Naidu
    The International Journal of Advanced Manufacturing Technology, 2000, 16 : 341 - 352
  • [10] Solving the Problem of Product-Conversion in Semiconductor Assembly and Test Manufacturing System by a Novel Heuristic Scheduling Algorithm
    Yao, Li-li
    Shi, Hai-bo
    Liu, Chang
    2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 508 - 512