Scheduling Multiple Groups of Jobs for a Multi-Line Steel Hot Rolling Mill

被引:1
|
作者
Kowalski, M. [1 ]
Steinboeck, A. [1 ]
Kugi, A. [1 ,2 ]
机构
[1] TU Wien, Automat & Control Inst, Gusshausstr 27-29, A-1040 Vienna, Austria
[2] Austrian Inst Technol AIT, Ctr Vis Automat & Control, Giefinggasse 4, A-1210 Vienna, Austria
来源
IFAC PAPERSONLINE | 2022年 / 55卷 / 21期
关键词
Production planning and control; multi-line hot rolling mill; job shop; sequence dependent setup times; traveling salesman problem; orienteering problem; heuristic algorithm; simulated annealing; ALGORITHM;
D O I
10.1016/j.ifacol.2022.09.262
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This work addresses the optimal scheduling for a multi-line steel hot rolling mill with two parallel production lines. Groups of products are manufactured at one of these lines in an alternate sequence. An optimal schedule minimizes the sum of the required setup times between all products and optimally fills up retooling times necessary at one line by processing a group of products at the other line. This requires both sequence optimization and, for some groups, the optimal selection of jobs. The optimization problem is a combination of traveling salesman and orienteering problems and considers all groups simultaneously. To iteratively solve the combined problem, an algorithm consisting of a heuristic simulated annealing and a local search procedure is employed. The effectiveness of the algorithm is analyzed in a case study. Copyright (C) 2022 The Authors.
引用
收藏
页码:168 / 173
页数:6
相关论文
共 50 条
  • [21] ALLOYED STEEL INTENDED FOR HOT-ROLLING MILL ROLLS
    SALEM, S
    METAL SCIENCE AND HEAT TREATMENT, 1993, 35 (11-12) : 657 - 659
  • [22] Hot Wear of Tools in a Rolling Mill for Steel Pipes.
    Cumino, G.
    Metallurgia Italiana, 1986, 78 (03): : 195 - 203
  • [23] A genetic algorithm approach to hot strip mill rolling scheduling problems
    Fang, HL
    Tsai, CH
    TENTH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 1998, : 264 - 271
  • [24] Integrated Framework for Bus Timetabling and Scheduling in Multi-Line Operation Mode
    Chen, Shengmei
    He, Zhaocheng
    Zhong, Jiaming
    APPLIED SCIENCES-BASEL, 2022, 12 (09):
  • [25] Integrated Multi-Objective Optimization for Reheating Furnace Scheduling and Rolling Plan in Hot Rolling Process of Steel Industry
    Wang, Qi
    Han, Zhongyang
    Zhao, Jun
    Wang, Wei
    2022 34TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2022, : 268 - 273
  • [26] On-line adaptive control in the hot rolling of steel
    CEGELEC Projects Ltd, Warwickshire, United Kingdom
    IEE Proc Control Theory Appl, 1 (15-24):
  • [27] On-line adaptive central in the hot rolling of steel
    Stephens, RI
    Randall, A
    IEE PROCEEDINGS-CONTROL THEORY AND APPLICATIONS, 1997, 144 (01): : 15 - 24
  • [28] Integration of batching and scheduling for hot rolling production in the steel industry
    Wang, Xianpeng
    Tang, Lixin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (5-6): : 431 - 441
  • [29] Integration of batching and scheduling for hot rolling production in the steel industry
    Xianpeng Wang
    Lixin Tang
    The International Journal of Advanced Manufacturing Technology, 2008, 36 : 431 - 441
  • [30] PLANETARY HOT-MILL ROLLING OF CONTINUOUSLY-CAST STEEL
    KNIGHT, DJ
    PALMER, AR
    JOURNAL OF METALS, 1966, 18 (05): : 578 - &