Scheduling Multiple Groups of Jobs for a Multi-Line Steel Hot Rolling Mill

被引:1
|
作者
Kowalski, M. [1 ]
Steinboeck, A. [1 ]
Kugi, A. [1 ,2 ]
机构
[1] TU Wien, Automat & Control Inst, Gusshausstr 27-29, A-1040 Vienna, Austria
[2] Austrian Inst Technol AIT, Ctr Vis Automat & Control, Giefinggasse 4, A-1210 Vienna, Austria
来源
IFAC PAPERSONLINE | 2022年 / 55卷 / 21期
关键词
Production planning and control; multi-line hot rolling mill; job shop; sequence dependent setup times; traveling salesman problem; orienteering problem; heuristic algorithm; simulated annealing; ALGORITHM;
D O I
10.1016/j.ifacol.2022.09.262
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This work addresses the optimal scheduling for a multi-line steel hot rolling mill with two parallel production lines. Groups of products are manufactured at one of these lines in an alternate sequence. An optimal schedule minimizes the sum of the required setup times between all products and optimally fills up retooling times necessary at one line by processing a group of products at the other line. This requires both sequence optimization and, for some groups, the optimal selection of jobs. The optimization problem is a combination of traveling salesman and orienteering problems and considers all groups simultaneously. To iteratively solve the combined problem, an algorithm consisting of a heuristic simulated annealing and a local search procedure is employed. The effectiveness of the algorithm is analyzed in a case study. Copyright (C) 2022 The Authors.
引用
收藏
页码:168 / 173
页数:6
相关论文
共 50 条
  • [1] Job Scheduling for a Multi-Line Steel Hot Rolling Mill With Selectable Furnaces
    Kowalski, M.
    Kugi, A.
    Steinboeck, A.
    IFAC PAPERSONLINE, 2023, 56 (02): : 5376 - 5381
  • [2] Multi-line rolling mill for special steel
    Fabris, R.
    Contaretti, A.
    Metallurgia Italiana, 1999, 91 (05): : 47 - 53
  • [3] Scheduling a hot rolling mill
    de Ladurantaye, D.
    Gendreau, M.
    Potvin, J-Y
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (03) : 288 - 300
  • [4] Artificial Ecosystem Algorithm Applied to Multi-Line Steel Scheduling
    Adham, Manal T.
    Bentley, Peter J.
    2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 982 - 989
  • [5] A flexible decision support system for steel hot rolling mill scheduling
    Cowling, P
    COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (02) : 307 - 321
  • [6] Multi-Line Batch Scheduling by Similarity
    Arnaldo, Ignacio
    Hemberg, Erik
    O'Reilly, Una-May
    PROCEEDINGS OF THE 2016 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE (GECCO'16 COMPANION), 2016, : 921 - 927
  • [7] A variable neighborhood search algorithm for scheduling the hot rolling operations at a steel mill
    Sorensen, Kenneth
    Cattrysse, Dirk
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1239 - 1243
  • [8] SINGLE-LINE MILL MATCHES MULTI-LINE PRODUCTIVITY
    WEISS, G
    CANADIAN FOREST INDUSTRIES, 1977, 97 (03) : 38 - 39
  • [9] A multi-agent architecture for dynamic scheduling of steel hot rolling
    Cowling, PI
    Ouelhadj, D
    Petrovic, S
    JOURNAL OF INTELLIGENT MANUFACTURING, 2003, 14 (05) : 457 - 470
  • [10] A multi-agent architecture for dynamic scheduling of steel hot rolling
    Peter I. Cowling
    Djamila Ouelhadj
    Sanja Petrovic
    Journal of Intelligent Manufacturing, 2003, 14 : 457 - 470