Material Based Penalty-Cost Quantification Model for Construction Projects Influencing Waste Management

被引:34
|
作者
Nawaz, Ahsan [1 ]
Chen, Jian [2 ]
Su, Xing [1 ]
Hassan, Hafiz Muhammad Zahid [3 ]
机构
[1] Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou, Peoples R China
[2] Zhejiang Univ Co Ltd, Architectural Design & Res Inst, Hangzhou, Peoples R China
[3] Guangzhou Univ, Sch Civil Engn, Guangzhou, Peoples R China
关键词
estimation of waste; construction projects; construction materials; penalty; cost quantification; waste management; LIFE-CYCLE ASSESSMENT; DEMOLITION WASTE; SUSTAINABLE MANAGEMENT; GENERATION; MINIMIZATION; CHALLENGES; SYSTEM; IMPACT; TOOL;
D O I
10.3389/fenvs.2022.807359
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Construction and demolition (C and D) waste generation is a critical issue for the construction industry, which negatively affects the economy, environment, and society. This study estimates the penalty-cost based on the produced C&D wastes in steel and concrete skeleton projects. Field survey and the BOQ data were collected from five concrete and four steel skeleton projects. The difference of materials used and wastes generated between concrete and steel skeleton projects were evaluated statistically (ANOVA and Welch and Brown-Forsythe). A financial analysis was implemented for estimating the penalty cost. The study outcomes demonstrate that the amount of waste that construction managers estimated is significantly lower than the actual amount generated. Furthermore, 0.055% of the total project cost of a penalty was estimated based on the waste produced at construction sites. In the end, the estimated penalty was validated by comparing it with the six recent completed projects. The penalty calculated in this study could save the project cost and reduce the C&D waste. As a result, imposing the estimated cost as a penalty would force construction managers to think thoroughly about the generated C&D waste problems. This study also has a novelty and will add to the body of knowledge by using penalty-cost quantification model to save project-cost of construction material-based-waste, and it can be further explored by adopting more quality data and engaging different construction materials.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Optimization of the waste management for construction projects using simulation
    Chandrakanthi, M
    Hettiaratchi, P
    Prado, B
    Ruwanpura, JY
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1771 - 1777
  • [32] Improving waste management in construction projects: An Australian study
    Udawatta, Nilupa
    Zuo, Jian
    Chiveralls, Keri
    Zillante, George
    RESOURCES CONSERVATION AND RECYCLING, 2015, 101 : 73 - 83
  • [33] Implementation of a waste management plan for construction projects in Singapore
    Ling, Florence Y.Y.
    Lim, Mark C.H.
    Architectural Science Review, 2002, 45 (02) : 73 - 81
  • [34] Model management assessment of building waste material on impact cost during construction stage (case study in Makassar city)
    Thoengsal, J.
    Latief, R. U.
    Hamzah, S.
    Rahim, I. R.
    3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING (ICCEE 2019), 2020, 419
  • [35] A risk management model for construction projects
    Smit, S
    Al-Jibouri, S
    van den Adel, J
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2233 - 2238
  • [36] A Holistic Assessment of Construction and Demolition Waste Management in the Nigerian Construction Projects
    Aboginije, Ademilade
    Aigbavboa, Clinton
    Thwala, Wellington
    SUSTAINABILITY, 2021, 13 (11)
  • [37] Cost Control Management of Construction Projects Based on Fuzzy Logic and Auction Theory
    Zeng, Zhao
    Gao, Ying
    IEEE ACCESS, 2024, 12 : 130292 - 130304
  • [38] Innovative Waste Management Through the Use of Waste Management Plans on Construction Projects in Nigeria
    Oladiran, Olatunji J.
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2009, 5 (03) : 165 - 176
  • [39] Model of Construction Waste Management Using AMOS-SEM for Indonesian Infrastructure Projects
    Elizar
    Suripin
    Wibowo, Mochamad Agung
    6TH INTERNATIONAL CONFERENCE OF EURO ASIA CIVIL ENGINEERING FORUM (EACEF 2017), 2017, 138
  • [40] Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam
    Thong Quoc Vu
    Cuong Phu Pham
    Thu Anh Nguyen
    Phong Thanh Nguyen
    Phuong Thanh Phan
    Quyen Le Hoang Thuy To Nguyen
    JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2020, 7 (09): : 389 - 400