Launch and early operation of the MESSENGER mission

被引:0
|
作者
Holdridge, Mark E. [1 ]
Calloway, Andrew B. [1 ]
机构
[1] Johns Hopkins Univ, Appl Phys Lab, Laurel, MD 20723 USA
基金
美国国家航空航天局;
关键词
Mercury; MESSENGER; mission operations;
D O I
10.1007/s11214-007-9261-8
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
On August 3, 2004, at 2:15 a.m. EST, the MESSENGER mission to Mercury began with liftoff of the Delta II 7925H launch vehicle and 1,107-kg spacecraft including seven instruments. MESSENGER is the seventh in the series of NASA Discovery missions, the third to be built and operated by The Johns Hopkins University Applied Physics Laboratory (JHU/APL) following the Near Earth Asteroid Rendezvous (NEAR) Shoemaker and Comet Nucleus Tour (CONTOUR) missions. The MESSENGER team at JHU/APL is using efficient operations approaches developed in support of the low-cost NEAR and CONTOUR operations while incorporating improved approaches for reducing total mission risk. This paper provides an overview of the designs and operational practices implemented to conduct the MESSENGER mission safely and effectively. These practices include proven approaches used on past JHU/APL operations and new improvements implemented to reduce risk, including adherence to time-proven standards of conduct in the planning and implementation of the mission. This paper also discusses the unique challenges of operating in orbit around Mercury, the closest planet to the Sun, and what specific measures are being taken to address those challenges.
引用
收藏
页码:573 / 600
页数:28
相关论文
共 50 条
  • [31] THE ESA EARTHCARE MISSION: APPROACHING LAUNCH
    Lefebvre, Alain
    Heliere, Arnaud
    Wallace, Kotska
    do Carmo, Joao Pereira
    Nakatsuka, Hirotaka
    Tomita, Eiichi
    IGARSS 2018 - 2018 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM, 2018, : 1841 - 1844
  • [32] China set for launch of manned mission
    Ramachandran, R
    PHYSICS WORLD, 2003, 16 (10) : 9 - 9
  • [33] MESSENGER Mission Design and Navigation
    James V. McAdams
    Robert W. Farquhar
    Anthony H. Taylor
    Bobby G. Williams
    Space Science Reviews, 2007, 131 : 219 - 246
  • [34] Fiery end for MESSENGER mission
    Banks, Michael
    PHYSICS WORLD, 2015, 28 (06) : 11 - 11
  • [35] Momentum management for the MESSENGER mission
    Vaughan, RM
    Haley, DR
    Shapiro, HS
    O'Shaughnessy, DJ
    ASTRODYNAMICS 2001, PTS I-III, 2001, 109 : 1139 - 1157
  • [36] The MESSENGER mission to mercury - Foreword
    Domingue, D. L.
    Russell, C. T.
    SPACE SCIENCE REVIEWS, 2007, 131 (1-4) : 1 - 2
  • [37] MESSENGER mission design and navigation
    McAdams, James V.
    Farquhar, Robert W.
    Taylor, Anthony H.
    Williams, Bobby G.
    SPACE SCIENCE REVIEWS, 2007, 131 (1-4) : 219 - 246
  • [38] Operation engineers ready for launch
    不详
    PROFESSIONAL ENGINEERING, 1999, 12 (22) : 12 - 12
  • [39] CloudSat mission: Performance and early science after the first year of operation
    Stephens, Graeme L.
    Vane, Deborah G.
    Tanelli, Simone
    Im, Eastwood
    Durden, Stephen
    Rokey, Mark
    Reinke, Don
    Partain, Philip
    Mace, Gerald G.
    Austin, Richard
    L'Ecuyer, Tristan
    Haynes, John
    Lebsock, Matthew
    Suzuki, Kentaroh
    Waliser, Duane
    Wu, Dong
    Kay, Jen
    Gettelman, Andrew
    Wang, Zhien
    Marchand, Rojer
    JOURNAL OF GEOPHYSICAL RESEARCH-ATMOSPHERES, 2008, 113 (D23)
  • [40] GLOBAL PRECIPITATION MEASUREMENT MISSION LAUNCH AND COMMISSIONING
    Davis, Nikesha
    DeWeese, Keith
    Vess, Melissa
    O'Donnell, James R., Jr.
    Welter, Gary
    GUIDANCE, NAVIGATION, AND CONTROL 2015, 2015, 154 : 467 - 478