Variation Negotiation in PPP Toll-Road Projects: Option Approach

被引:3
|
作者
Nguyen, Tuan Anh [1 ]
Sun, Yuting [2 ]
机构
[1] Natl Univ Civil Engn, Dept Construct Econ, Hanoi 100000, Vietnam
[2] Univ New South Wales, Sch Civil & Environm Engn, Sydney, NSW 2052, Australia
关键词
Variation; Negotiation; Public-private partnerships (PPP); Real options analysis (ROA); PUBLIC-PRIVATE PARTNERSHIPS; INCOMPLETE CONTRACTS; CHANGE ORDERS; CONSTRUCTION PROJECTS; IMPACT; COST; CONCESSIONS; INFRASTRUCTURE; MANAGEMENT; OWNERSHIP;
D O I
10.1061/(ASCE)LA.1943-4170.0000495
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
The literature on public-private partnership (PPP) agreements suggests that variation renegotiation places the public sector authority at a disadvantage, because the authority has to pay extra costs to claim its variation. This leads to the need for a PPP contract to incorporate flexibility, embedded with real options analysis (ROA), to deal with these variations. This paper proposes that PPP agreements should ideally contain an option for the authority to order variation as an effective response to changing circumstances in the postconstruction phase throughout the concession period of toll roads. Having the variation option, the authority sets a threshold on the concessionaire's bargaining power via variation negotiation as the authority can order its variation at its favorably controlled price. The paper also presents the ROA, based on the probabilistic cash flow approach, that gives the financial value of flexibility for the authority to order variation. This approach is straightforward and provides a fair way forward for the implementation of PPP toll roads. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Incentive contracts with demand guarantee in BOT toll road projects
    Zhao, Yunpeng
    Song, Jinbo
    Feng, Zhuo
    Jin, Lulu
    RESEARCH IN TRANSPORTATION ECONOMICS, 2023, 98
  • [22] Infrisk simulation in risk influence of investing toll road projects
    Soehodho, S
    Susantono, B
    Prasetya, SW
    PROCEEDINGS OF THE EASTERN ASIA SOCIETY FOR TRANSPORTATION STUDIES, Vol 4, Nos 1 AND 2, 2003, 4 (1-2): : 1520 - 1531
  • [23] Valuation of strategic network flexibility in development of toll road projects
    Damnjanovic, Ivan
    Duthie, Jennifer
    Waller, S. Travis
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (09) : 979 - 990
  • [24] GOVERNANCE CHALLENGES IN PROMOTING TOLL ROAD PROJECTS: A CASE OF INDONESIA
    Parikesit, Danang
    Black, John
    GEOTECHNICAL ENGINEERING FOR DISASTER MITIGATION AND REHABILITATION 2011/GEOTECHNICAL AND HIGHWAY ENGINEERING - PRACTICAL APPLICATIONS, CHALLENGES AND OPPORTUNITIES, 2011, : 208 - 215
  • [25] Demand and operating cost forecasting accuracy for toll road projects
    Welde, Morten
    TRANSPORT POLICY, 2011, 18 (05) : 765 - 771
  • [26] Real Options Model of Toll-Adjustment Mechanism in Concession Contracts of Toll Road Projects
    Chen, Qing
    Shen, Geoffrey
    Xue, Fan
    Xia, Bo
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (01)
  • [27] Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory
    Liu, Jicai
    Gao, Ruolan
    Cheah, Charles Yuen Jen
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (06)
  • [28] AN OPTION PRICING APPROACH TO EVALUATING PETROLEUM PROJECTS
    EKERN, S
    ENERGY ECONOMICS, 1988, 10 (02) : 91 - 99
  • [29] VALUE OF INVESTORS' ESCALATION OF COMMITMENT IN PPP PROJECTS USING REAL OPTION THINKING
    Gao, Ruolan
    Liu, Jicai
    INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2020, 24 (05) : 348 - 364
  • [30] Investigation and Modeling of Financial Risks Associated with PPP Road Projects in India
    Kagne, Rutuja K.
    Vyas, Gayatri S.
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2020 - PLANNING AND DEVELOPMENT, 2020, : 309 - 318