Sequential imperfect preventive maintenance models with two categories of failure modes

被引:9
|
作者
Lin, DM
Zuo, MJ [1 ]
Yam, RCM
机构
[1] Univ Toronto, Dept Mech & Ind Engn, Toronto, ON M5S 3G8, Canada
[2] Univ Alberta, Dept Mech Engn, Edmonton, AB T6G 2G8, Canada
[3] City Univ Hong Kong, Dept Mfg Engn & Engn Management, Hong Kong, Hong Kong, Peoples R China
关键词
preventive maintenance (PM); Age Reduction Model; Hazard Rate Model; Hybrid Model; maintainable failure modes; nonmaintainable failure modes;
D O I
10.1002/1520-6750(200103)48:2<172::AID-NAV5>3.0.CO;2-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we introduce the concept of two categories of failure modes: maintainable failure modes and nonmaintainable failure modes into the modeling of preventive maintenance IPM) activities. The hybrid model proposed by Lin et al. is used to model the effect of a PM activity on the failure rate function of maintainable failure modes. However, PM does not change the hazard rate function of nonmaintainable failure modes. PM is performed at a sequence of intervals. The objective is to determine the optimal PM schedules to minimize the mean cost rate. Numerical examples for Weibull hazard rates ate given. (C) 2001 John Wiley & Sons, Inc.
引用
收藏
页码:172 / 183
页数:12
相关论文
共 50 条
  • [31] Effect of Load on Sequential Imperfect Preventive Maintenance and Replacement Schedules of Mechanically Repairable Machines
    Udoh, Nse
    Uko, Iniobong
    Bassey, Kufre
    JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2023, 16 (02): : 337 - 356
  • [32] A production model with imperfect preventive maintenance
    Wang, Chih-Hsiung
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2005, 8 (03): : 601 - 613
  • [33] An alternative imperfect preventive maintenance model
    Clavareau, J.
    Labeau, P. E.
    SAFETY, RELIABILITY AND RISK ANALYSIS: THEORY, METHODS AND APPLICATIONS, VOLS 1-4, 2009, : 455 - 462
  • [34] Modelling and Analysis of Maintenance Contract with Imperfect Preventive Maintenance
    Husniah, H.
    Cakravastia, A.
    Iskandar, B. P.
    Pasaribu, U. S.
    2015 INTERNATIONAL CONFERENCE ON TECHNOLOGY, INFORMATICS, MANAGEMENT, ENGINEERING & ENVIRONMENT (TIME-E), 2015, : 25 - 30
  • [35] A modelling approach to optimal imperfect maintenance of repairable equipment with multiple failure modes
    Mullor, R.
    Mulero, J.
    Trottini, M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 128 : 24 - 31
  • [36] An Extended Periodic Imperfect Preventive Maintenance Model With Age-Dependent Failure Type
    Sheu, Shey-Huei
    Chang, Chin-Chih
    IEEE TRANSACTIONS ON RELIABILITY, 2009, 58 (02) : 397 - 405
  • [37] Generalized Accelerated Failure Time Frailty Model for Systems Subject to Imperfect Preventive Maintenance
    Yin, Huilin
    Yang, Xiaohan
    Peng, Rui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [38] Imperfect Preventive Maintenance Policies With Unpunctual Execution
    Wang, Xiaolin
    Zhou, Hang
    Parlikad, Ajith Kumar
    Xie, Min
    IEEE TRANSACTIONS ON RELIABILITY, 2020, 69 (04) : 1480 - 1492
  • [39] OPTIMUM POLICIES WHEN PREVENTIVE MAINTENANCE IS IMPERFECT
    NAKAGAWA, T
    IEEE TRANSACTIONS ON RELIABILITY, 1979, 28 (04) : 331 - 332
  • [40] Optimal schedule for periodic imperfect preventive maintenance
    Shin, SW
    Kim, DK
    Lim, JH
    Advanced Reliability Modeling, 2004, : 467 - 473