Research on PONC Calculation Method in Manufacturing Process Based on Working Procedure

被引:0
|
作者
Xie, Defeng [1 ]
Wang, Hui [1 ]
Fu, Xiuli [1 ]
Liu, Chunlei [1 ]
机构
[1] Univ Jinan, Sch Mech Engn, Jinan 250022, Shandong, Peoples R China
关键词
Manufacturing process; PONC; Quality cost;
D O I
10.4028/www.scientific.net/AMR.139-141.1879
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Implicit cost (PONC) which was produced by nonconformance in manufacturing process bring a large number of loss to the enterprise. For the data of PONC during manufacturing process is difficult to collect, and difficult to calculate costing of scrap and rework PONC, the included projects and the calculation method of Price of Nonconformance is proposed and analyzed to quantify scrap and rework PONC. The calculation method can be programmed and implemented by means of C# language in the paper, and the working procedure which the Price of Nonconformance is beyond the standard is analyzed and improved. The results of example analysis and verification show the calculation method of PONC is effective way to improve the efficiency of cost management, reduce quality cost, improve product quality and increase the economic efficiency of enterprise.
引用
收藏
页码:1879 / 1882
页数:4
相关论文
共 50 条
  • [31] Research of the practical calculation method and procedure Of long self-anchored suspension bridge
    Tang, Mian
    Ning, Yucai
    Xu, Xia
    He, Xuhui
    [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2333 - 2339
  • [32] Decision-making method of green manufacturing process based on process database
    Jiang, ZG
    Zhang, H
    Wang, SH
    [J]. PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 382 - 385
  • [33] Manufacturing process resource modeling and retrieval method based on features
    Li, Shuang-Yue
    Long, Hong-Neng
    Yin, Guo-Fu
    Jiang, Hua
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (06): : 1061 - 1065
  • [34] A Method on Manufacturing Process Monitoring Based on Value Stream Mapping
    Gan, Dongyu
    Zou, Xinfeng
    Zhang, Xuewei
    Lin, Jiaqi
    Zhang, Yongyang
    Guo, Jidong
    Zhou, Dawei
    [J]. PROCEEDINGS OF TEPEN 2022, 2023, 129 : 508 - 517
  • [35] Similarity based method for manufacturing process performance prediction and diagnosis
    Liu, Jianbo
    Djurdjanovic, Dragan
    Ni, Jun
    Casoetto, Nicolas
    Lee, Jay
    [J]. COMPUTERS IN INDUSTRY, 2007, 58 (06) : 558 - 566
  • [36] Modeling method of manufacturing process quality based on Bayesian networks
    Dong, Ye-Hong
    Xiang, Dong
    Long, Dan-Feng
    Liu, Chang
    Duan, Guang-Hong
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (12): : 2564 - 2569
  • [37] RESULTS OF RESEARCH WORK IN WORKING TIME CALCULATION
    不详
    [J]. LANDTECHNIK, 1981, 36 (11): : 541 - 542
  • [39] Research of business process modeling method based on the function view of computer integrated manufacturing open system architecture
    Luo, Haibin
    Fa, Yushun
    Wu, Cheng
    [J]. Kongzhi yu Juece/Control and Decision, 1999, 14 (04): : 324 - 328
  • [40] Gantt Chart Based Calculation Method for Process Immunity Time
    Zhong Q.
    He Q.
    Chen W.
    Xu Z.
    Mo W.
    Chen W.
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (07): : 174 - 178