Cost Control of Arbitration in Construction Projects

被引:1
|
作者
Mehany, Mohammed Hashem M. [1 ]
Jennings, Scott [2 ]
Kumar, Shantanu [1 ]
机构
[1] Colorado State Univ, Dept Construct Management, Ft Collins, CO 80523 USA
[2] SJ Construct Consulting LLC, POB 37238, Honolulu, HI 96837 USA
关键词
Office buildings - Architectural design - Apartment houses;
D O I
10.1061/(ASCE)LA.1943-4170.0000530
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
Arbitration has been the alternative dispute resolution to litigation in many contractual agreements and among many construction projects. It was promoted as a better alternative dispute resolution method to the litigation process due to the presumed decrease in both time and expense. However, over the last decades, arbitration proceedings have become longer, more expensive, and almost comparable to litigation. Despite having many other alternative dispute resolution methods, arbitration is still the most prevalent method in many contractual agreements. Therefore, arbitration cost and time overrun issues have to be addressed in order to understand the reasons behind the cost overruns and to allow the discovery of different opportunities to mitigate arbitration costs while maintaining the arbitration process efficiency. This research study identifies the root causes for arbitration cost overruns and analyzes the different scenarios that lead to these overruns. The study also analyzes the different control and mitigation strategies that can be utilized to better control arbitration costs. (C) 2022 American Society of Civil Engineers.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Construction cost control
    Wagman, David
    [J]. POWER ENGINEERING, 2008, 112 (09) : 68 - +
  • [42] CONSTRUCTION COST CONTROL
    不详
    [J]. JOURNAL OF ACCOUNTANCY, 1952, 93 (04): : 492 - 492
  • [43] EFFECTS OF CONSTRUCTION COST AND VOLUME ON CONSTRUCTION TIME OF EDUCATIONAL PROJECTS IN TEXAS
    Choudhury, Ifte
    [J]. 2012 ASEE ANNUAL CONFERENCE, 2012,
  • [44] COST MANAGEMENT IN CONSTRUCTION PROJECTS WITH THE APPROACH OF COST-TIME BALANCING
    Lou, Ashkan Khoda Bandeh
    Parvishi, Alireza
    Javidi, Ebrahim
    [J]. IIOAB JOURNAL, 2016, 7 : 157 - 164
  • [45] Improving cost estimates of construction projects using phased cost factors
    Liu, Li
    Zhu, Kai
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (01) : 91 - 95
  • [46] CONTROL OF PROJECTS DURING CONSTRUCTION - DISCUSSION
    NEALE, DE
    FRANCIS, HWA
    BARBER, JN
    BELL, R
    PURVES, D
    SHILSTON, AW
    NORMAN, A
    CRANSTON, WB
    TOBIN, G
    SVEHLA, K
    DUFFY, PJ
    THOMAS, RD
    NINOS, GE
    WEARNE, SH
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1987, 82 : 859 - 869
  • [47] Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance
    Hwang, Bon-Gang
    Zhu, Lei
    Wang, Yinglin
    Cheong, Xinyi
    [J]. PROJECT MANAGEMENT JOURNAL, 2017, 48 (04) : 67 - 79
  • [48] Project Managers' Profile Influence on Design and Implementation of Cost Monitoring and Control Systems for Construction Projects
    Aretoulis, Georgios N.
    Kalfakakou, Glykeria P.
    Seridou, Aikaterini A.
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (03) : 1 - 25
  • [49] Research on Influencing Factors and Control Measures of Construction Cost Overrun in China's Expressway Projects
    Chen, Shiwei
    Fan, Xingyue
    Cai, Binqing
    [J]. International Journal of Fuzzy System Applications, 2023, 12 (01)
  • [50] Dynamic modeling to reduce the cost of quality in construction projects
    Shafiei, Iman
    Eshtehardian, Ehsan
    Nasirzadeh, Farnad
    Arabi, Shiva
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (01) : 24 - 37