The effect of relationship management on project performance in construction

被引:278
|
作者
Meng, Xianhai [1 ]
机构
[1] Queens Univ Belfast, Sch Planning Architecture & Civil Engn, Belfast BT9 5AG, Antrim, North Ireland
关键词
Supply chain; Relationship management; Construction project; Time delay; Cost overrun; Quality defect; CRITICAL SUCCESS FACTORS; TRUST;
D O I
10.1016/j.ijproman.2011.04.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Construction projects often suffer from poor performance in terms of time delays, cost overruns and quality defects. The causes of poor performance have often been analysed. However, few studies have addressed the influence of supply chain relationships on project performance in construction. To fill in this gap, a questionnaire survey is carried out in the UK construction industry to explore the specific characteristics of supply chain relationships in construction and to assess their impact on project performance. In this study, a supply chain relationship is described by key indicators in ten areas: mutual objectives, gain and pain sharing, trust, no-blame culture, joint working, communication, problem solving, risk allocation, performance measurement, and continuous improvement. The analysis reveals that the deterioration of the relationship between project parties may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of the relationship. The adoption of supply chain collaboration and partnering helps to solve the performance problems, in which a long-term collaboration is more favourable for performance improvement than a short-term collaboration. In addition to the questionnaire survey, a series of industrial experts are interviewed to provide a deeper insight into the effect of relationship management on project performance. (C) 2011 Elsevier Ltd. PMA and IPMA. All rights reserved.
引用
收藏
页码:188 / 198
页数:11
相关论文
共 50 条
  • [31] Construction project management
    Ahmad, I
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (02) : 51 - 51
  • [32] Study on Risk Allocationand Management Performance Measurement of Construction Project
    YilinYin
    Li, Pengjuan
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 2346 - 2350
  • [33] Knowledge Management Factors Affecting Construction Project Performance Model
    Alhammadi, Eman Mohammed Abdulrahman
    Kasim, Rozilah
    Lohana, Sonia
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2022, 13 (01): : 149 - 158
  • [34] Project Time Management and Schedule Performance in Mexican Construction Projects
    Solis-Carcano, Romel G.
    Corona-Suarez, Gilberto A.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2119 - 2128
  • [35] The Effect of Stakeholders Satisfaction and Project Management Performance on Transitions in a Project Management Office
    Barbalho, Sanderson C. M.
    De Toledo, Jose Carlos
    Da Silva, Isaac Ambrosio
    [J]. IEEE ACCESS, 2019, 7 : 169385 - 169398
  • [36] Project Management Maturity and Performance of Building Construction Projects in Myanmar
    Htoo, Tin Thurain
    Dodanwala, Tharindu C.
    Santoso, Djoen San
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2023, 28 (01)
  • [37] Knowledge management as a performance enhancing tool in construction project management in South Africa
    Talukhaba, Alfred
    Taiwo, Adekunle
    [J]. ACTA STRUCTILIA, 2009, 16 (01) : 33 - 63
  • [38] The Influence of Project Life Cycle and Key Performance Indicators in Project Management Performance: Comparison between ICT and Construction Project
    Humaidi, Norshima
    Said, Noor Azzah
    [J]. CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 26 - 31
  • [39] Effects of Relationship and Contract Governance on Construction Project Performance: Review and Prospects
    Luo, Yazhuo
    Zheng, Bohai
    Fang, Yuan
    Yin, Xiuqin
    [J]. ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 639 - 649
  • [40] Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance
    Ahmed, Riaz
    Hussain, Abrar
    Philbin, Simon P.
    [J]. ENGINEERING MANAGEMENT JOURNAL, 2022, 34 (03) : 374 - 393