Lean Preanalytic Process Improvement of Lymphoma Workup

被引:0
|
作者
D'Angelo, R. [1 ]
Inamdar, K. [1 ]
Varney, R. [1 ]
Lubensky, D. [1 ]
Sharma, G. [1 ]
Crane, J. [1 ]
Pimentel, J. [1 ]
Kryvenko, O. N. [1 ]
Zarbo, R. J. [1 ]
机构
[1] Henry Ford Hlth Syst, Detroit, MI USA
关键词
D O I
暂无
中图分类号
R-3 [医学研究方法]; R3 [基础医学];
学科分类号
1001 ;
摘要
1841
引用
收藏
页码:433A / 433A
页数:1
相关论文
共 50 条
  • [41] Best Practices in Lean Six Sigma Process Improvement: A Deeper Look
    Lev, Benjamin
    [J]. INTERFACES, 2009, 39 (05) : 494 - 495
  • [42] Lean construction and simulation for performance improvement: a case study of reinforcement process
    Bajjou, Mohamed Saad
    Chafi, Anas
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2021, 70 (02) : 459 - 487
  • [43] Best Practices in Lean Six Sigma Process Improvement: A Deeper Look
    Weinstein, Larry B.
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2009, 16 (04) : 562 - +
  • [44] Lean process improvement shortens total molecular diagnostic testing time
    Cankovic, A.
    Whiteley, L.
    Brown, R.
    D'Angelo, R.
    Zarbo, R. D.
    [J]. MODERN PATHOLOGY, 2008, 21 : 355A - 355A
  • [45] Lean methodology for performance improvement in the trauma discharge process EDITORIAL CRITIQUE
    Santry, Heena P.
    [J]. JOURNAL OF TRAUMA AND ACUTE CARE SURGERY, 2014, 77 (01): : 142 - 142
  • [46] Lean process improvement shortens total molecular diagnostic testing time
    Cankovic, M.
    Whiteley, L.
    Brown, R.
    D'Angelo, R.
    Zarbo, R. J.
    [J]. LABORATORY INVESTIGATION, 2008, 88 : 355A - 355A
  • [47] Application of LEAN Production System Tools for Manual Assembly Process Improvement
    Kleiza, V.
    Tilindis, J.
    [J]. MECHANIKA 2012: PROCEEDINGS OF THE 17TH INTERNATIONAL CONFERENCE, 2012, : 130 - 133
  • [48] Bottleneck Identification And Process Improvement By Lean Six Sigma DMAIC Methodology
    Nandakumar, Nikhil
    Saleeshya, P. G.
    Harikumar, Priya
    [J]. MATERIALS TODAY-PROCEEDINGS, 2020, 24 : 1217 - 1224
  • [49] SIMULATION-BASED VERIFICATION OF LEAN IMPROVEMENT FOR EMERGENCY ROOM PROCESS
    Khurma, Nancy
    Bacioiu, Gheorghe M.
    Pasek, Zbigniew J.
    [J]. 2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 1490 - 1499
  • [50] Meta-analysis of Lean case studies for the business process improvement
    Tiamaz, Younes
    Souissi, Nissrine
    [J]. 2016 4TH IEEE INTERNATIONAL COLLOQUIUM ON INFORMATION SCIENCE AND TECHNOLOGY (CIST), 2016, : 175 - 181