Building lifecycle management

被引:0
|
作者
Bonandrini, S [1 ]
Cruz, C [1 ]
Nicolle, C [1 ]
机构
[1] Active3D Lab, F-21066 Dijon, France
关键词
information systems; IFC; CAD; building;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Our proposal concerns ongoing research at the University of Burgundy, in collaboration with Active3D-Lab Company, for the development of a method to manage civil engineering projects and corresponding facilities management. This method is made up of processes, specific models and tools. The processes make it possible to structure the various phases, codified by professionals, which organize the lifecycle of buildings. Construction and a building's life information comes from heterogeneous sources (heterogeneity of professions, heterogeneity of data formats, and heterogeneity of validation processes). We propose an innovative approach which gives a global view of a buildings lifecycle including facilities management aspect. This approach is based on a data model standard called IFC which was developed by the International Alliance for Interoperability. A collaborative Internet platform was developed to support the building lifecycle. This platform is mainly used to federate all the actions realized on a building during its lifecycle, to merge all information relating to these actions in an adaptive hypermedia graph, to extract some trade views of the building by combining information collected during the lifecycle from heterogeneous sources and to handle all these views through a dynamic and adaptive 3D interface. This platform won the technological innovation gold medal at the international show BATIMAT in Paris in November 2003.
引用
收藏
页码:461 / 471
页数:11
相关论文
共 50 条
  • [31] Product lifecycle management
    Staresinic, Daniel
    TCE, 2007, (791): : 40 - 41
  • [32] ADAPTABILITY IN ARCHITECTURE IN RELATION TO THE BUILDING LIFECYCLE
    Luley, Marek
    Oberfrancova, Lucia
    11TH ARCHITECTURE IN PERSPECTIVE 2019/11 ARCHITEKURA V PERSPEKTIVE 2019, 2019, : 294 - 298
  • [33] Ontology-based integration of building and related information models for integrated lifecycle energy management
    Scherer, R. J.
    Katranuschkov, P.
    Kadolsky, M.
    Laine, T.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2012, : 951 - 956
  • [34] The experience of implementing and using the Windchill product lifecycle management system at the energy machine building enterprise
    Kultyshev A.Y.
    Blagodarev A.A.
    Gladkii A.V.
    Shanturov D.N.
    Thermal Engineering, 2013, 60 (8) : 559 - 566
  • [35] Information Lifecycle Modeling Framework for Construction Project Lifecycle Management
    Hu, Wenfa
    2008 INTERNATIONAL SEMINAR ON FUTURE INFORMATION TECHNOLOGY AND MANAGEMENT ENGINEERING, PROCEEDINGS, 2008, : 372 - 375
  • [36] Developing a BIM-enabled building lifecycle management system for owners: Architecture and case scenario
    Li, Lingzhi
    Yuan, Jingfeng
    Tang, Meiling
    Xu, Zhao
    Xu, Wei
    Cheng, Yusi
    AUTOMATION IN CONSTRUCTION, 2021, 129 (129)
  • [37] Building a cognitive platform for the managed IT services lifecycle
    Kloeckner, K.
    Adam, C. M.
    Anerousis, N.
    Ayachitula, N.
    Bulut, M. F.
    Dasgupta, G.
    Deng, Y.
    Diao, Y.
    Fuller, N.
    Gopisetty, S.
    Hernandez, M.
    Hwang, J.
    Iannucci, P.
    Kalia, A. K.
    Lanfranchi, G.
    Lanyi, D.
    Ludwig, H.
    Mahamuni, A.
    Mahindru, R.
    Meng, F. J.
    Nezhad, H. R. Motahari
    Murthy, K.
    Nakamura, T.
    Paradkar, A.
    Perpetua, D.
    Pfitzmann, B.
    Rosu, D.
    Shwartz, L.
    Su, Z.
    Surendra, M.
    Tao, S.
    Volzer, H.
    Vukovic, M.
    Wiesmann, D.
    Wozniak, S.
    Wright, G.
    Xiao, J.
    Zeng, S.
    IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 2018, 62 (01)
  • [38] PRODUCT LIFECYCLE MANAGEMENT: A SURVEY
    Liu, Wei
    Zeng, Yong
    Maletz, Michael
    Brisson, Dan
    ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, PROCEEDINGS, VOL 2, PTS A AND B, 2010, : 1213 - 1225
  • [39] Akzeptanzorientiertes Application Lifecycle Management
    Stefan H. Hallerstede
    Frank Danzinger
    Angelika C. Bullinger
    Kathrin M. Möslein
    HMD Praxis der Wirtschaftsinformatik, 2011, 48 (2) : 30 - 40
  • [40] überbetriebliches Service Lifecycle Management
    Thomas Puschmann
    Rainer Alt
    HMD Praxis der Wirtschaftsinformatik, 2011, 48 (2) : 58 - 67