A heuristic approach for solution of MINLP problem for production scheduling in preemptive mode

被引:3
|
作者
Yuceer, M [1 ]
Berber, R [1 ]
机构
[1] Ankara Univ, Fac Engn, Dept Chem Engn, TR-06100 Ankara, Turkey
关键词
production scheduling; MILP; MINLP;
D O I
10.1016/j.cep.2004.11.001
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Chemical engineering problems formulated as mixed integer nonlinear programming (MINLP) model are difficult to solve when the model is non-convex. In order to overcome this difficulty, a semi-heuristic algorithm for production scheduling was developed in this work. Using this approach, the non-convex MINLP problem is first considered as an MELP problem without dividing the orders into units. The order causing prolonged delivery time is thus identified, constraints for this order are then relaxed and MILP problem is re-solved using the new constraints. Having reached the new schedule, the quantitative distribution of the specific order to different units is deten-nined by solving the LP problem that does not contain integer variables since allocation of orders to the units, and processing order are known. The results obtained with three example problems indicate improvements over previously reported schedules and therefore, give promise that the suggested strategy may be used in moderately sized industrial applications. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:933 / 940
页数:8
相关论文
共 50 条
  • [41] An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
    Demeulemeester, EL
    Herroelen, WS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 334 - 348
  • [42] A new heuristic and an exact approach for a production planning problem
    Peter Auer
    György Dósa
    Tibor Dulai
    Armin Fügenschuh
    Peggy Näser
    Ronald Ortner
    Ágnes Werner-Stark
    [J]. Central European Journal of Operations Research, 2021, 29 : 1079 - 1113
  • [43] A new heuristic and an exact approach for a production planning problem
    Auer, Peter
    Dosa, Gyorgy
    Dulai, Tibor
    Fuegenschuh, Armin
    Naeser, Peggy
    Ortner, Ronald
    Werner-Stark, Agnes
    [J]. CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2021, 29 (03) : 1079 - 1113
  • [44] A resource constrained project scheduling problem with reattempt at failure: A heuristic approach
    Mori, M
    Tseng, CC
    [J]. JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) : 33 - 44
  • [45] A Heuristic Scheduling Approach to Hybrid Makepsan Problem for Data Intensive Computing
    Liang, Wei
    Xiong, Yonghua
    Wu, Min
    Jin, Qun
    [J]. 2015 IEEE INTERNATIONAL CONFERENCE ON SMART CITY/SOCIALCOM/SUSTAINCOM (SMARTCITY), 2015, : 932 - 937
  • [46] A heuristic approach for a scheduling problem in additive manufacturing under technological constraints
    Aloui, Aymen
    Hadj-Hamou, Khaled
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 154
  • [47] An Automatic Heuristic Design Approach for Seru Scheduling Problem with Resource Conflicts
    Zhan, Rongxin
    Zhang, Jinhui
    Cui, Zihua
    Peng, Jin
    Li, Dongni
    [J]. DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [48] Flow shop scheduling problem with limited machine availability: A heuristic approach
    Aggoune, R
    Portmann, MC
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) : 4 - 15
  • [49] A note on "a genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem"
    Han, Yi
    Cai, Jianhu
    Kaku, Ikou
    Lin, Huazhen
    Ye, Xuhong
    Guo, Haidong
    [J]. NUMBERS, INTELLIGENCE, MANUFACTURING TECHNOLOGY AND MACHINERY AUTOMATION, 2012, 127 : 527 - +
  • [50] REACTIVE SCHEDULING FOR A SINGLE-MACHINE - PROBLEM DEFINITION, ANALYSIS, AND HEURISTIC SOLUTION
    HUANG, YG
    KANAL, LN
    TRIPATHI, SK
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1990, 3 (01) : 6 - 12