First results of the new endcap TOF commissioning at BESIII

被引:6
|
作者
Wu, Z. [1 ,2 ]
Sun, S. [1 ,2 ]
Heng, Y. [1 ,2 ]
Wang, X. [1 ,2 ,3 ]
Sun, Y. [2 ,3 ]
Li, C. [2 ,3 ]
Liu, Z. [2 ,3 ]
Dai, H. [1 ,2 ]
Zhang, J. [1 ,2 ]
Cao, P. [2 ,3 ]
Sun, W. [2 ,3 ]
Wang, S. [2 ,3 ]
Wang, Y. [2 ,3 ]
Ji, X. [1 ,2 ]
Zhao, J. [1 ,2 ]
Gong, W. [1 ,2 ]
Chen, M. [1 ,2 ]
Ye, M. [1 ,2 ]
Qiu, Y. [1 ,2 ]
Ma, X. [1 ,2 ]
Xu, M. [1 ,2 ]
Luo, X. [1 ,2 ]
Li, J. [1 ,2 ]
Yang, R. [1 ,2 ,3 ]
An, F. [1 ,2 ]
An, Q. [2 ,3 ]
Jiang, X. [1 ,2 ]
Liu, Zhen-an [1 ,2 ]
Liu, S. [2 ,3 ]
Zhu, K. [1 ,2 ]
机构
[1] Inst High Energy Phys, Expt Phys Ctr, 19B Yuquan Rd, Beijing 100049, Peoples R China
[2] USTC, IHEP, State Key Lab Particle Detect & Elect, Hefei, Peoples R China
[3] USTC, Dept Modern Phys, JinZhai Rd 96, Hefei 230026, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Instrumentation and methods for time-of-flight (TOF) spectroscopy; Spectrometers; Resistive-plate chambers; PROTOTYPE; MRPC; DETECTOR; SYSTEM;
D O I
10.1088/1748-0221/11/07/C07005
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.
引用
收藏
页数:8
相关论文
共 50 条
  • [31] Commissioning and first results of the LNLS XAFS beamline
    Tolentino, H
    Cezar, JC
    Cruz, DZ
    Compagnon-Cailhol, V
    Tamura, E
    Alves, MCM
    JOURNAL OF SYNCHROTRON RADIATION, 1998, 5 : 521 - 523
  • [32] EMIR at the GTC: results on the first commissioning at the telescope
    Garzon, F.
    Castro, N.
    Insausti, M.
    Manjavacas, E.
    Miluzio, M.
    Hammersley, Peter
    Cardiel, N.
    Pascual, S.
    Gonzalez-Fernandez, C.
    Molgo, J.
    Barreto, M.
    Fernandez, P.
    Joven, E.
    Lopez, P.
    Mato, A.
    Moreno, H.
    Nunez, M.
    Patron, J.
    Rosich, J.
    Vega, N.
    GROUND-BASED AND AIRBORNE INSTRUMENTATION FOR ASTRONOMY VI, 2016, 9908
  • [33] First Commissioning Results of the KSTAR Cryogenic System
    Kim, Yaung-Soo
    Park, Y. M.
    Lee, Y. J.
    Kwag, S. W.
    Chang, Y. B.
    Song, N. H.
    Woo, I. S.
    Park, H. T.
    Cho, K. W.
    Chang, H. S.
    Park, D. S.
    Joo, J. J.
    Moon, K. M.
    Park, K. R.
    Chu, Yong
    Yonekawa, Hirofumi
    Kim, Y. O.
    Bang, E. N.
    Kim, H. K.
    Kim, K. P.
    Park, M. K.
    Baek, S.
    Hong, J. S.
    Ha, T. H.
    Kim, Y. J.
    Hwang, I. S.
    Yang, H. L.
    Oh, Y. K.
    Bak, J. S.
    Kwon, M.
    Lee, G. S.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2009, 19 (03) : 1577 - 1581
  • [34] ArDM: first results from underground commissioning
    Badertscher, A.
    Bay, F.
    Bourgeois, N.
    Cantini, C.
    Curioni, A.
    Daniel, M.
    Degunda, U.
    Di Luise, S.
    Epprecht, L.
    Gendotti, A.
    Horikawa, S.
    Knecht, L.
    Lussi, D.
    Maire, G.
    Montes, B.
    Murphy, S.
    Natterer, G.
    Nikolics, K.
    Nguyen, K.
    Periale, L.
    Ravat, S.
    Resnati, F.
    Romero, L.
    Rubbia, A.
    Santorelli, R.
    Sergiampietri, F.
    Sgalaberna, D.
    Viant, T.
    Wu, S.
    JOURNAL OF INSTRUMENTATION, 2013, 8
  • [35] Commissioning of the upgraded CSC Endcap Muon Port Cards at CMS
    Ecklund, K.
    Liu, J.
    Madorsky, A.
    Matveev, M.
    Michlin, B.
    Padley, P.
    Rorie, J.
    JOURNAL OF INSTRUMENTATION, 2016, 11
  • [36] Commissioning and first results of the Fermilab Muon Campus
    Stratakis, Diktys
    Drendel, Brian
    Morgan, James P.
    Syphers, Michael J.
    Froemming, Nathan S.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2019, 22 (01):
  • [37] First commissioning results from Hall A at TJNAF
    Michaels, R
    INTERSECTIONS BETWEEN PARTICLE AND NUCLEAR PHYSICS - 6TH CONFERENCE, 1997, (412): : 307 - 310
  • [38] Time calibration for barrel TOF system of BESIII
    Sun Shengsen
    INTERNATIONAL CONFERENCE ON COMPUTING IN HIGH ENERGY AND NUCLEAR PHYSICS 2012 (CHEP2012), PTS 1-6, 2012, 396
  • [39] Overview on BESIII results
    Xu, Guofa
    NUCLEAR AND PARTICLE PHYSICS PROCEEDINGS, 2015, 263 : 5 - 9
  • [40] Review of BESIII results
    Ping, Rong-Gang
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2013, 234 : 133 - 138