共 50 条
- [41] AUTOMATIC SUBMERGED-ARC WELDING OF THICK SHEET ALUMINUM WELDING PRODUCTION, 1973, 20 (06): : 79 - 80
- [42] EFFECTIVENESS OF EMPLOYING METAL FILLERS IN SUBMERGED-ARC WELDING WELDING PRODUCTION, 1973, 20 (05): : 74 - 76
- [43] AN EXPERT SYSTEM TO GENERATE SUBMERGED-ARC WELDING PROCEDURES FOURTH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED PRODUCTION ENGINEERING, 1988, : 535 - 539
- [45] ENERGOMASHEKSPORT OFFERS - AUTOMATIC MACHINES FOR SUBMERGED-ARC WELDING WELDING PRODUCTION, 1972, 19 (10): : 97 - 99
- [46] AUTOMATIC SUBMERGED-ARC BUTT WELDING WITH INCREASED GAPS WELDING PRODUCTION, 1973, 20 (02): : 41 - 43
- [48] PHASE ANALYSIS OF THE SLAG AFTER SUBMERGED-ARC WELDING MATERIALI IN TEHNOLOGIJE, 2016, 50 (01): : 101 - 107
- [50] THE EFFECTIVENESS OF SUBMERGED-ARC WELDING WITH POWDER METAL USING A POWERFUL ARC WELDING PRODUCTION, 1981, 28 (03): : 37 - 40